Cargando…
Installation of new equipment: Movable irradiation tables operational
Autores principales: | Glaser, M, Moll, M, Ravotti, F |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1594787 |
Ejemplares similares
-
Installation of infrastructure
por: Casse, G., et al.
Publicado: (2015) -
Upgrade scenarios for irradiation lines:: Upgrade of the Proton Irradiation Facility in the CERN PS EAST AREA
por: Ravotti, F., et al.
Publicado: (2014) -
Commissioning of new facility equipment
por: B.Gkotse, B., et al.
Publicado: (2015) -
A New High-intensity Proton Irradiation Facility at the CERN PS East Area
por: Gkotse, B, et al.
Publicado: (2014) -
East Area Irradiation Test Facility: Preliminary FLUKA calculations
por: Lebbos, E, et al.
Publicado: (2011)