Cargando…

Optimization of the Energy Usage at CERN

Some of the efforts of CERN to optimize its energy usage are presented. Work is proceeding in several areas: campus and infrastructure, accelerators and beam lines, as well as R&D for future accelerators. The existing building stock is being renovated and new buildings apply an integrated energy...

Descripción completa

Detalles Bibliográficos
Autores principales: Burckhart, H J, Burnet, J P, Caspers, F, Doré, V, Gatignon, L, Martel, C, Nonis, M, Tommasini, D
Lenguaje:eng
Publicado: 2013
Materias:
Acceso en línea:http://cds.cern.ch/record/1594987
_version_ 1780931122009473024
author Burckhart, H J
Burnet, J P
Caspers, F
Doré, V
Gatignon, L
Martel, C
Nonis, M
Tommasini, D
author_facet Burckhart, H J
Burnet, J P
Caspers, F
Doré, V
Gatignon, L
Martel, C
Nonis, M
Tommasini, D
author_sort Burckhart, H J
collection CERN
description Some of the efforts of CERN to optimize its energy usage are presented. Work is proceeding in several areas: campus and infrastructure, accelerators and beam lines, as well as R&D for future accelerators. The existing building stock is being renovated and new buildings apply an integrated energy concept. The energy efficiency of the accelerators and beam lines can be further enhanced by powering more equipment dynamically only during the time it is really needed. For designing new accelerators novel approaches are being investigated to re-use energy which in today’s installations gets dumped thermally.
id cern-1594987
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2013
record_format invenio
spelling cern-15949872019-09-30T06:29:59Zhttp://cds.cern.ch/record/1594987engBurckhart, H JBurnet, J PCaspers, FDoré, VGatignon, LMartel, CNonis, MTommasini, DOptimization of the Energy Usage at CERNAccelerators and Storage RingsSome of the efforts of CERN to optimize its energy usage are presented. Work is proceeding in several areas: campus and infrastructure, accelerators and beam lines, as well as R&D for future accelerators. The existing building stock is being renovated and new buildings apply an integrated energy concept. The energy efficiency of the accelerators and beam lines can be further enhanced by powering more equipment dynamically only during the time it is really needed. For designing new accelerators novel approaches are being investigated to re-use energy which in today’s installations gets dumped thermally.CERN-ACC-2013-0182oai:cds.cern.ch:15949872013-05-12
spellingShingle Accelerators and Storage Rings
Burckhart, H J
Burnet, J P
Caspers, F
Doré, V
Gatignon, L
Martel, C
Nonis, M
Tommasini, D
Optimization of the Energy Usage at CERN
title Optimization of the Energy Usage at CERN
title_full Optimization of the Energy Usage at CERN
title_fullStr Optimization of the Energy Usage at CERN
title_full_unstemmed Optimization of the Energy Usage at CERN
title_short Optimization of the Energy Usage at CERN
title_sort optimization of the energy usage at cern
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1594987
work_keys_str_mv AT burckharthj optimizationoftheenergyusageatcern
AT burnetjp optimizationoftheenergyusageatcern
AT caspersf optimizationoftheenergyusageatcern
AT dorev optimizationoftheenergyusageatcern
AT gatignonl optimizationoftheenergyusageatcern
AT martelc optimizationoftheenergyusageatcern
AT nonism optimizationoftheenergyusageatcern
AT tommasinid optimizationoftheenergyusageatcern