Cargando…
Commissioning of the Linac4 RFQ at the 3 MeV test stand
Linac4, the future 160 MeV Hˉ injector to the CERN Proton Synchrotron Booster, is presently under construction at CERN as a first step of the planned upgrade of the LHC injectors. The low energy section of LINAC4, consisting of an ion source, a 352.2 MHz Radio Frequency Quadrupole (RFQ) and a choppe...
Autores principales: | Rossi, C, Arnaudon, L, Bellodi, G, Broere, J, Brunner, O, Lombardi, A M, Balula, J M, Yanez, P M, Noirjean, J, Pasquino, C, Raich, U, Roncarolo, F, Vretenar, M, Desmons, M, France, A, Piquet, O |
---|---|
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1595497 |
Ejemplares similares
-
Commissioning and Operational Experience Gained with the Linac4 RFQ at CERN
por: Rossi, Carlo, et al.
Publicado: (2014) -
The RF Design of the Linac4 RFQ
por: Piquet, Olivier, et al.
Publicado: (2010) -
RF Design and Tuning of Linac4 RFQ
por: France, A C, et al.
Publicado: (2012) -
Assembly and RF Tuning of the Linac4 RFQ at CERN
por: Rossi, C, et al.
Publicado: (2013) -
Progress in the fabrication of the RFQ accelerator for the CERN Linac4
por: Rossi, C, et al.
Publicado: (2010)