Cargando…
ATLAS IBL Stave QA - In and Around SR1
During the Phase-I upgrade the ATLAS Inner tracker will have a whole new layer of pixels inserted between the existing B-layer and a new, smaller, beam pipe. Briefly, there are 14 assemblies of 32 single and double-chip hybrid silicon pixel chips arranged side-by-side on light-weight, thermally con...
Autor principal: | Carney, Rebecca |
---|---|
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1598080 |
Ejemplares similares
-
ATLAS Pixel IBL: Stave Quality Assurance
por: The ATLAS collaboration
Publicado: (2014) -
IBL Stave Quality Assurance
por: The ATLAS collaboration
Publicado: (2014) -
Performance tests during the ATLAS IBL Stave Integration
por: Jentzsch, Jennifer
Publicado: (2014) -
Performance Tests during the IBL Stave Integration
por: Backhaus, M
Publicado: (2014) -
Performance tests during the IBL Stave Integration
por: Jentzsch, J
Publicado: (2014)