Cargando…
Optics commissioning for the first p-Pb run in the LHC
The first physics production with asymmetric p-Pb collisions in 2013 required a complex machine commissioning to be done in a very short time after the Christmas technical stop. A substantial part of this was the commissioning of the newly created squeeze process to $\beta$*= 0:8m at IP2, as well a...
Autores principales: | Versteegen, R, Jowett, J M, Langner, A, Levinsen, Y, McAteer, M, McLean, E, Persson, T, Skowronski, P, Solfaroli, M, Tomas, R, Wenninger, J, White, S |
---|---|
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1601795 |
Ejemplares similares
-
Operating the LHC Off-Momentum for p-Pb Collisions
por: Versteegen, R, et al.
Publicado: (2013) -
Optics Performance of the LHC during the 2012 Run
por: Skowronski, P, et al.
Publicado: (2013) -
Determination of Octupole and Sextupole Polarities in the LHC
por: McAteer, M, et al.
Publicado: (2013) -
Magnet polarities in the LHC
por: McAteer, M, et al.
Publicado: (2014) -
1% calibration errors in MQY magnets
por: Bach, T, et al.
Publicado: (2013)