LHCb: Radiation hard programmable delay line for LHCb Calorimeter Upgrade

This poster describes the implementation of a SPI-programmable clock delay chip based on a Delay Locked Loop (DLL) in order to shift the phase of the LHC clock (25 ns) in steps of 1ns, with a 4ps jitter and 18ps of DNL. The delay lines will be integrated into ICECAL, the LHCb calorimeter front-end A...

Descripción completa

Detalles Bibliográficos
Autores principales: Mauricio Ferre, J, Gascón, D, Vilasís Cardona, X, Picatoste Olloqui, E, Machefert, F, Lefrançois, J, Duarte, O
Lenguaje:eng
Publicado: 2013
Acceso en línea:http://cds.cern.ch/record/1605096
_version_ 1780931617743699968
author Mauricio Ferre, J
Gascón, D
Vilasís Cardona, X
Picatoste Olloqui, E
Machefert, F
Lefrançois, J
Duarte, O
author_facet Mauricio Ferre, J
Gascón, D
Vilasís Cardona, X
Picatoste Olloqui, E
Machefert, F
Lefrançois, J
Duarte, O
author_sort Mauricio Ferre, J
collection CERN
description This poster describes the implementation of a SPI-programmable clock delay chip based on a Delay Locked Loop (DLL) in order to shift the phase of the LHC clock (25 ns) in steps of 1ns, with a 4ps jitter and 18ps of DNL. The delay lines will be integrated into ICECAL, the LHCb calorimeter front-end ASIC in the near future. The stringent noise requirements on the ASIC imply minimizing the noise contribution of digital components. This is accomplished by implementing the DLL in differential mode. To achieve the required radiation tolerance several techniques are applied: double guard rings between PMOS and NMOS transistors as well as glitch suppressors and TMR Registers. This 5.7 mm2 chip has been implemented in CMOS 0.35um technology.
id cern-1605096
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2013
record_format invenio
spelling cern-16050962019-09-30T06:29:59Zhttp://cds.cern.ch/record/1605096engMauricio Ferre, JGascón, DVilasís Cardona, XPicatoste Olloqui, EMachefert, FLefrançois, JDuarte, OLHCb: Radiation hard programmable delay line for LHCb Calorimeter UpgradeThis poster describes the implementation of a SPI-programmable clock delay chip based on a Delay Locked Loop (DLL) in order to shift the phase of the LHC clock (25 ns) in steps of 1ns, with a 4ps jitter and 18ps of DNL. The delay lines will be integrated into ICECAL, the LHCb calorimeter front-end ASIC in the near future. The stringent noise requirements on the ASIC imply minimizing the noise contribution of digital components. This is accomplished by implementing the DLL in differential mode. To achieve the required radiation tolerance several techniques are applied: double guard rings between PMOS and NMOS transistors as well as glitch suppressors and TMR Registers. This 5.7 mm2 chip has been implemented in CMOS 0.35um technology.Poster-2013-285oai:cds.cern.ch:16050962013-09-24
spellingShingle Mauricio Ferre, J
Gascón, D
Vilasís Cardona, X
Picatoste Olloqui, E
Machefert, F
Lefrançois, J
Duarte, O
LHCb: Radiation hard programmable delay line for LHCb Calorimeter Upgrade
title LHCb: Radiation hard programmable delay line for LHCb Calorimeter Upgrade
title_full LHCb: Radiation hard programmable delay line for LHCb Calorimeter Upgrade
title_fullStr LHCb: Radiation hard programmable delay line for LHCb Calorimeter Upgrade
title_full_unstemmed LHCb: Radiation hard programmable delay line for LHCb Calorimeter Upgrade
title_short LHCb: Radiation hard programmable delay line for LHCb Calorimeter Upgrade
title_sort lhcb: radiation hard programmable delay line for lhcb calorimeter upgrade
url http://cds.cern.ch/record/1605096
work_keys_str_mv AT mauricioferrej lhcbradiationhardprogrammabledelaylineforlhcbcalorimeterupgrade
AT gascond lhcbradiationhardprogrammabledelaylineforlhcbcalorimeterupgrade
AT vilasiscardonax lhcbradiationhardprogrammabledelaylineforlhcbcalorimeterupgrade
AT picatosteolloquie lhcbradiationhardprogrammabledelaylineforlhcbcalorimeterupgrade
AT machefertf lhcbradiationhardprogrammabledelaylineforlhcbcalorimeterupgrade
AT lefrancoisj lhcbradiationhardprogrammabledelaylineforlhcbcalorimeterupgrade
AT duarteo lhcbradiationhardprogrammabledelaylineforlhcbcalorimeterupgrade