Cargando…

Preliminary Beam Tests at REX for an Automatic Cavity Phasing Routine at HIE-ISOLDE

The HIE upgrade at ISOLDE will use 32 independently phased superconducting quarterwave cavities, which will impose new demands on the operation and set-up of the linac. The large range of different radioactive species and the broad experimental programme means that the same beam species and energy a...

Descripción completa

Detalles Bibliográficos
Autores principales: Fraser, M A, Voulot, D, Broere, J, Lanaia, D, Valuch, D
Lenguaje:eng
Publicado: 2013
Materias:
Acceso en línea:http://cds.cern.ch/record/1607125
_version_ 1780931713057161216
author Fraser, M A
Voulot, D
Broere, J
Lanaia, D
Valuch, D
author_facet Fraser, M A
Voulot, D
Broere, J
Lanaia, D
Valuch, D
author_sort Fraser, M A
collection CERN
description The HIE upgrade at ISOLDE will use 32 independently phased superconducting quarterwave cavities, which will impose new demands on the operation and set-up of the linac. The large range of different radioactive species and the broad experimental programme means that the same beam species and energy are rarely studied twice, and the accelerator must be re-tuned for each experimental run. In order to expedite machine set-up it is foreseen to calculate and set automatically the cavity phases when the operator inputs the desired beam energy and A/q of the beam species. In this note we explore our understanding of the REX rf system and test our beam dynamics calculations with two independently phased 7-gap split-ring cavities.
id cern-1607125
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2013
record_format invenio
spelling cern-16071252023-08-04T20:24:51Zhttp://cds.cern.ch/record/1607125engFraser, M AVoulot, DBroere, JLanaia, DValuch, DPreliminary Beam Tests at REX for an Automatic Cavity Phasing Routine at HIE-ISOLDEAccelerators and Storage RingsThe HIE upgrade at ISOLDE will use 32 independently phased superconducting quarterwave cavities, which will impose new demands on the operation and set-up of the linac. The large range of different radioactive species and the broad experimental programme means that the same beam species and energy are rarely studied twice, and the accelerator must be re-tuned for each experimental run. In order to expedite machine set-up it is foreseen to calculate and set automatically the cavity phases when the operator inputs the desired beam energy and A/q of the beam species. In this note we explore our understanding of the REX rf system and test our beam dynamics calculations with two independently phased 7-gap split-ring cavities.CERN-ACC-Note-2013-0028oai:cds.cern.ch:16071252013-10-09
spellingShingle Accelerators and Storage Rings
Fraser, M A
Voulot, D
Broere, J
Lanaia, D
Valuch, D
Preliminary Beam Tests at REX for an Automatic Cavity Phasing Routine at HIE-ISOLDE
title Preliminary Beam Tests at REX for an Automatic Cavity Phasing Routine at HIE-ISOLDE
title_full Preliminary Beam Tests at REX for an Automatic Cavity Phasing Routine at HIE-ISOLDE
title_fullStr Preliminary Beam Tests at REX for an Automatic Cavity Phasing Routine at HIE-ISOLDE
title_full_unstemmed Preliminary Beam Tests at REX for an Automatic Cavity Phasing Routine at HIE-ISOLDE
title_short Preliminary Beam Tests at REX for an Automatic Cavity Phasing Routine at HIE-ISOLDE
title_sort preliminary beam tests at rex for an automatic cavity phasing routine at hie-isolde
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1607125
work_keys_str_mv AT fraserma preliminarybeamtestsatrexforanautomaticcavityphasingroutineathieisolde
AT voulotd preliminarybeamtestsatrexforanautomaticcavityphasingroutineathieisolde
AT broerej preliminarybeamtestsatrexforanautomaticcavityphasingroutineathieisolde
AT lanaiad preliminarybeamtestsatrexforanautomaticcavityphasingroutineathieisolde
AT valuchd preliminarybeamtestsatrexforanautomaticcavityphasingroutineathieisolde