Cargando…

Challenges in the ATLAS Monte Carlo Production during run 1 and beyond

In this presentation we will review the ATLAS Monte Carlo production setup including the different production steps involved in full and fast detector simulation. A report on the Monte Carlo production campaigns during run 1 and long shutdown 1 will be presented, including details on various perform...

Descripción completa

Detalles Bibliográficos
Autor principal: Ehrenfeld, W
Lenguaje:eng
Publicado: 2013
Materias:
Acceso en línea:http://cds.cern.ch/record/1610289
Descripción
Sumario:In this presentation we will review the ATLAS Monte Carlo production setup including the different production steps involved in full and fast detector simulation. A report on the Monte Carlo production campaigns during run 1 and long shutdown 1 will be presented, including details on various performance aspects. Important improvements in the workflow and software will be highlighted. Besides standard Monte Carlo production for data analyses at 7 and 8 TeV, the production accomodates for various specialised activities. These ranges from extended Monte Carlo validation, Geant4 validation, pileup simulation using zero bias data and production for various upgrade studies. The challenges of these activities will be discussed.