Cargando…

Challenges in the ATLAS Monte Carlo Production during run 1 and beyond

In this presentation we will review the ATLAS Monte Carlo production setup including the different production steps involved in full and fast detector simulation. A report on the Monte Carlo production campaigns during run 1 and long shutdown 1 will be presented, including details on various perform...

Descripción completa

Detalles Bibliográficos
Autor principal: Ehrenfeld, W
Lenguaje:eng
Publicado: 2013
Materias:
Acceso en línea:http://cds.cern.ch/record/1610289
_version_ 1780932014399029248
author Ehrenfeld, W
author_facet Ehrenfeld, W
author_sort Ehrenfeld, W
collection CERN
description In this presentation we will review the ATLAS Monte Carlo production setup including the different production steps involved in full and fast detector simulation. A report on the Monte Carlo production campaigns during run 1 and long shutdown 1 will be presented, including details on various performance aspects. Important improvements in the workflow and software will be highlighted. Besides standard Monte Carlo production for data analyses at 7 and 8 TeV, the production accomodates for various specialised activities. These ranges from extended Monte Carlo validation, Geant4 validation, pileup simulation using zero bias data and production for various upgrade studies. The challenges of these activities will be discussed.
id cern-1610289
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2013
record_format invenio
spelling cern-16102892019-09-30T06:29:59Zhttp://cds.cern.ch/record/1610289engEhrenfeld, WChallenges in the ATLAS Monte Carlo Production during run 1 and beyondDetectors and Experimental TechniquesIn this presentation we will review the ATLAS Monte Carlo production setup including the different production steps involved in full and fast detector simulation. A report on the Monte Carlo production campaigns during run 1 and long shutdown 1 will be presented, including details on various performance aspects. Important improvements in the workflow and software will be highlighted. Besides standard Monte Carlo production for data analyses at 7 and 8 TeV, the production accomodates for various specialised activities. These ranges from extended Monte Carlo validation, Geant4 validation, pileup simulation using zero bias data and production for various upgrade studies. The challenges of these activities will be discussed.ATL-SOFT-SLIDE-2013-841oai:cds.cern.ch:16102892013-10-14
spellingShingle Detectors and Experimental Techniques
Ehrenfeld, W
Challenges in the ATLAS Monte Carlo Production during run 1 and beyond
title Challenges in the ATLAS Monte Carlo Production during run 1 and beyond
title_full Challenges in the ATLAS Monte Carlo Production during run 1 and beyond
title_fullStr Challenges in the ATLAS Monte Carlo Production during run 1 and beyond
title_full_unstemmed Challenges in the ATLAS Monte Carlo Production during run 1 and beyond
title_short Challenges in the ATLAS Monte Carlo Production during run 1 and beyond
title_sort challenges in the atlas monte carlo production during run 1 and beyond
topic Detectors and Experimental Techniques
url http://cds.cern.ch/record/1610289
work_keys_str_mv AT ehrenfeldw challengesintheatlasmontecarloproductionduringrun1andbeyond