Cargando…
Challenges in the ATLAS Monte Carlo Production during run 1 and beyond
In this presentation we will review the ATLAS Monte Carlo production setup including the different production steps involved in full and fast detector simulation. A report on the Monte Carlo production campaigns during run 1 and long shutdown 1 will be presented, including details on various perform...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1610289 |
_version_ | 1780932014399029248 |
---|---|
author | Ehrenfeld, W |
author_facet | Ehrenfeld, W |
author_sort | Ehrenfeld, W |
collection | CERN |
description | In this presentation we will review the ATLAS Monte Carlo production setup including the different production steps involved in full and fast detector simulation. A report on the Monte Carlo production campaigns during run 1 and long shutdown 1 will be presented, including details on various performance aspects. Important improvements in the workflow and software will be highlighted. Besides standard Monte Carlo production for data analyses at 7 and 8 TeV, the production accomodates for various specialised activities. These ranges from extended Monte Carlo validation, Geant4 validation, pileup simulation using zero bias data and production for various upgrade studies. The challenges of these activities will be discussed. |
id | cern-1610289 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2013 |
record_format | invenio |
spelling | cern-16102892019-09-30T06:29:59Zhttp://cds.cern.ch/record/1610289engEhrenfeld, WChallenges in the ATLAS Monte Carlo Production during run 1 and beyondDetectors and Experimental TechniquesIn this presentation we will review the ATLAS Monte Carlo production setup including the different production steps involved in full and fast detector simulation. A report on the Monte Carlo production campaigns during run 1 and long shutdown 1 will be presented, including details on various performance aspects. Important improvements in the workflow and software will be highlighted. Besides standard Monte Carlo production for data analyses at 7 and 8 TeV, the production accomodates for various specialised activities. These ranges from extended Monte Carlo validation, Geant4 validation, pileup simulation using zero bias data and production for various upgrade studies. The challenges of these activities will be discussed.ATL-SOFT-SLIDE-2013-841oai:cds.cern.ch:16102892013-10-14 |
spellingShingle | Detectors and Experimental Techniques Ehrenfeld, W Challenges in the ATLAS Monte Carlo Production during run 1 and beyond |
title | Challenges in the ATLAS Monte Carlo Production during run 1 and beyond |
title_full | Challenges in the ATLAS Monte Carlo Production during run 1 and beyond |
title_fullStr | Challenges in the ATLAS Monte Carlo Production during run 1 and beyond |
title_full_unstemmed | Challenges in the ATLAS Monte Carlo Production during run 1 and beyond |
title_short | Challenges in the ATLAS Monte Carlo Production during run 1 and beyond |
title_sort | challenges in the atlas monte carlo production during run 1 and beyond |
topic | Detectors and Experimental Techniques |
url | http://cds.cern.ch/record/1610289 |
work_keys_str_mv | AT ehrenfeldw challengesintheatlasmontecarloproductionduringrun1andbeyond |