Cargando…
LHCb: Evaluation of 400m, 5Gbit Versatile Link lengths over OM3 and OM4 fibres for the LHCb upgrade
The LHCb experiment will upgrade its DAQ system to a trigger less, 40MHz read-out after LS2. To be able to process the approximately 40Tbit/s of data we will require a massive computing farm. This computing farm can not be installed underground, in the vicinity of the detector anymore due to the eno...
Autores principales: | Schwemmer, R, Cachemiche, J-P, Neufeld, N, Soos, C, Troska, J, Wyllie, K |
---|---|
Lenguaje: | eng |
Publicado: |
2013
|
Acceso en línea: | http://cds.cern.ch/record/1612511 |
Ejemplares similares
-
Evaluation of 400 m, 4.8 Gbit/s Versatile Link lengths over OM3 and OM4 fibres for the LHCb upgrade
por: Schwemmer, R, et al.
Publicado: (2014) -
Electronics Architecture of the LHCb Upgrade
por: Wyllie, Ken, et al.
Publicado: (2013) -
LHCb : Clock and timing distribution in the LHCb upgraded detector and readout system
por: Alessio, Federico, et al.
Publicado: (2014) -
Identifying Organic Matter (OM) Types and Characterizing
OM Pores in the Wufeng–Longmaxi Shales
por: Xie, Guoliang, et al.
Publicado: (2022) -
Professor Om Prakash Sharma
por: Shrivastava, Nirbhay
Publicado: (2011)