Cargando…

RLIUP: Review of LHC and Injector Upgrade Plans: Centre de Convention, Archamps, France 29 - 31 Oct 2013

This report contains the Proceedings of the "Review of LHC and Injector Upgrade Plans" (RLIUP), held in the Centre de Convention, Archamps, France, 29–31 October 2013. The RLIUP examined the parameters of the LIU and HL-LHC projects following the experience and changes in the beam paramete...

Descripción completa

Detalles Bibliográficos
Autores principales: Goddard, B, Zimmermann, F
Lenguaje:eng
Publicado: CERN 2014
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2014-006
http://cds.cern.ch/record/1629486
Descripción
Sumario:This report contains the Proceedings of the "Review of LHC and Injector Upgrade Plans" (RLIUP), held in the Centre de Convention, Archamps, France, 29–31 October 2013. The RLIUP examined the parameters of the LIU and HL-LHC projects following the experience and changes in the beam parameters experienced over the previous two years. It discussed which level of integrated luminosity will necessitate a replacement of the inner detectors and the insertions, the importance of reaching 3000 $fb^{-1}$ or the minimum integrated luminosity which would be tolerated. The main outcome of RLIUP is a staged path from the LHC performance at the end of 2012 to the required performance for the HL-LHC, along with a number of important recommendations on the work organization of the coming years.