Cargando…

RLIUP: Review of LHC and Injector Upgrade Plans: Centre de Convention, Archamps, France 29 - 31 Oct 2013

This report contains the Proceedings of the "Review of LHC and Injector Upgrade Plans" (RLIUP), held in the Centre de Convention, Archamps, France, 29–31 October 2013. The RLIUP examined the parameters of the LIU and HL-LHC projects following the experience and changes in the beam paramete...

Descripción completa

Detalles Bibliográficos
Autores principales: Goddard, B, Zimmermann, F
Lenguaje:eng
Publicado: CERN 2014
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2014-006
http://cds.cern.ch/record/1629486
_version_ 1780934138013941760
author Goddard, B
Zimmermann, F
author_facet Goddard, B
Zimmermann, F
author_sort Goddard, B
collection CERN
description This report contains the Proceedings of the "Review of LHC and Injector Upgrade Plans" (RLIUP), held in the Centre de Convention, Archamps, France, 29–31 October 2013. The RLIUP examined the parameters of the LIU and HL-LHC projects following the experience and changes in the beam parameters experienced over the previous two years. It discussed which level of integrated luminosity will necessitate a replacement of the inner detectors and the insertions, the importance of reaching 3000 $fb^{-1}$ or the minimum integrated luminosity which would be tolerated. The main outcome of RLIUP is a staged path from the LHC performance at the end of 2012 to the required performance for the HL-LHC, along with a number of important recommendations on the work organization of the coming years.
id cern-1629486
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2014
publisher CERN
record_format invenio
spelling cern-16294862021-09-20T08:28:16Zdoi:10.5170/CERN-2014-006http://cds.cern.ch/record/1629486engGoddard, BZimmermann, FRLIUP: Review of LHC and Injector Upgrade Plans: Centre de Convention, Archamps, France 29 - 31 Oct 2013RLIUP: Review of LHC and Injector Upgrade PlansDetectors and Experimental TechniquesThis report contains the Proceedings of the "Review of LHC and Injector Upgrade Plans" (RLIUP), held in the Centre de Convention, Archamps, France, 29–31 October 2013. The RLIUP examined the parameters of the LIU and HL-LHC projects following the experience and changes in the beam parameters experienced over the previous two years. It discussed which level of integrated luminosity will necessitate a replacement of the inner detectors and the insertions, the importance of reaching 3000 $fb^{-1}$ or the minimum integrated luminosity which would be tolerated. The main outcome of RLIUP is a staged path from the LHC performance at the end of 2012 to the required performance for the HL-LHC, along with a number of important recommendations on the work organization of the coming years.CERNCERN-2014-006oai:cds.cern.ch:16294862014
spellingShingle Detectors and Experimental Techniques
Goddard, B
Zimmermann, F
RLIUP: Review of LHC and Injector Upgrade Plans: Centre de Convention, Archamps, France 29 - 31 Oct 2013
title RLIUP: Review of LHC and Injector Upgrade Plans: Centre de Convention, Archamps, France 29 - 31 Oct 2013
title_full RLIUP: Review of LHC and Injector Upgrade Plans: Centre de Convention, Archamps, France 29 - 31 Oct 2013
title_fullStr RLIUP: Review of LHC and Injector Upgrade Plans: Centre de Convention, Archamps, France 29 - 31 Oct 2013
title_full_unstemmed RLIUP: Review of LHC and Injector Upgrade Plans: Centre de Convention, Archamps, France 29 - 31 Oct 2013
title_short RLIUP: Review of LHC and Injector Upgrade Plans: Centre de Convention, Archamps, France 29 - 31 Oct 2013
title_sort rliup: review of lhc and injector upgrade plans: centre de convention, archamps, france 29 - 31 oct 2013
topic Detectors and Experimental Techniques
url https://dx.doi.org/10.5170/CERN-2014-006
http://cds.cern.ch/record/1629486
work_keys_str_mv AT goddardb rliupreviewoflhcandinjectorupgradeplanscentredeconventionarchampsfrance2931oct2013
AT zimmermannf rliupreviewoflhcandinjectorupgradeplanscentredeconventionarchampsfrance2931oct2013
AT goddardb rliupreviewoflhcandinjectorupgradeplans
AT zimmermannf rliupreviewoflhcandinjectorupgradeplans