Cargando…

Design of Air-Cooled Beam Dump for Extraction Line of PS Booster

A new beam dump has been designed, which withstands the future proton beam extracted from the Proton Syncrotron Booster (PSB) at CERN, consisting of up to 1E14 protons per pulse at 2 GeV after its upgrade in 2018/2019. In order to be able to efficiently release the deposited heat, the new dump will...

Descripción completa

Detalles Bibliográficos
Autores principales: Perillo-Marcone, A, Sarrio-Martinez, A, Venturi, V, Antonakakis, T, Vlachoudis, V, Nowak, E, Mason, G, Battistin, M, Czapski, M, Sgobba, S
Lenguaje:eng
Publicado: 2013
Materias:
Acceso en línea:http://cds.cern.ch/record/1636117

Ejemplares similares