Cargando…
Design of Air-Cooled Beam Dump for Extraction Line of PS Booster
A new beam dump has been designed, which withstands the future proton beam extracted from the Proton Syncrotron Booster (PSB) at CERN, consisting of up to 1E14 protons per pulse at 2 GeV after its upgrade in 2018/2019. In order to be able to efficiently release the deposited heat, the new dump will...
Autores principales: | Perillo-Marcone, A, Sarrio-Martinez, A, Venturi, V, Antonakakis, T, Vlachoudis, V, Nowak, E, Mason, G, Battistin, M, Czapski, M, Sgobba, S |
---|---|
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1636117 |
Ejemplares similares
-
Design and operation of the air-cooled beam dump for the extraction line of CERN's Proton Synchrotron Booster (PSB)
por: Perillo-Marcone, Antonio, et al.
Publicado: (2019) -
Design of the Future High Energy Beam Dump for the CERN SPS
por: Pianese, Stefano, et al.
Publicado: (2018) -
Design of a high power production target for the Beam Dump Facility at CERN
por: Lopez Sola, E., et al.
Publicado: (2019) -
Determination of Transverse Beam Sizes at the PS Booster Dump
por: Hermanns, T
Publicado: (2010) -
Upgrade Strategies for the Proton Synchrotron Booster Dump at CERN
por: Sarrio Martinez, A, et al.
Publicado: (2012)