Cargando…
Magnet Misalignment Studies for the Front-end of the Neutrino Factory
In the Neutrino Factory front-end the muon beam coming from the interaction of a high-power (4 MW) proton beam on a mercury jet target is transformed through a buncher, a phase rotator and an ionization cooling channel before entering the downstream acceleration system. The muon front-end channel is...
Autores principales: | Prior, G, Efthymiopoulos, I, Stratakis, D, Neuffer, D, Snopok, P, Rogers, C |
---|---|
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1636123 |
Ejemplares similares
-
Muon front end for the neutrino factory
por: Rogers, C T, et al.
Publicado: (2013) -
Muon capture in the front end of the IDS neutrino factory
por: Neuffer, D., et al.
Publicado: (2010) -
Muon capture in the front end of the IDS neutrino factory
por: Neuffer, D., et al.
Publicado: (2012) -
Review of the Neutrino Factory Muon Front End
por: Rogers, C, et al.
Publicado: (2011) -
IDR muon capture front end and variations
por: Neuffer, David, et al.
Publicado: (2012)