Cargando…
Fast Cycled Magnet demonstrator program at CERN: Instrumentation and measurement campaign
In an effort to develop economical magnets for an upgrade of the LHC injector complex, CERN started an R&D program on superconducting Fast Cycled Magnets (FCM) in 2009. One of the challenges in this program was to develop a test station, which started working in summer 2012 when the FCM dipole d...
Autores principales: | , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2013.2287641 http://cds.cern.ch/record/1662561 |
Sumario: | In an effort to develop economical magnets for an upgrade of the LHC injector complex, CERN started an R&D program on superconducting Fast Cycled Magnets (FCM) in 2009. One of the challenges in this program was to develop a test station, which started working in summer 2012 when the FCM dipole demonstrator was tested. The magnet contains several important features, like forced-flow cooling of supercritical He and it has a protection scheme based direct voltage measurement with co-wound voltage tap wires. In this paper we report on the cryogenic and powering requirements and operation, the quench protection system, the temperature and mechanical measurements. The functioning of the test station and instrumentation are evaluated and we will discuss the measurements on a detailed level. |
---|