Cargando…
Fast Cycled Magnet demonstrator program at CERN: Instrumentation and measurement campaign
In an effort to develop economical magnets for an upgrade of the LHC injector complex, CERN started an R&D program on superconducting Fast Cycled Magnets (FCM) in 2009. One of the challenges in this program was to develop a test station, which started working in summer 2012 when the FCM dipole d...
Autores principales: | Willering, G, Bajko, M, Borgnolutti, F, Bottura, L, Datskov, V, Deferne, G, Feuvrier, J, Fiscarelli, L, Giloux, C, Guinchard, M, Roger, V |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2013.2287641 http://cds.cern.ch/record/1662561 |
Ejemplares similares
-
Strand and Cable R&D for Fast Cycled Magnets at CERN
por: Bottura, L, et al.
Publicado: (2011) -
Strand and Cable R\&D for Fast Cycled Magnets at CERN
por: Bottura, L, et al.
Publicado: (2011) -
Cold Powering Performance of the First 2 m $Nb_3Sn$ DS11T Twin-Aperture Model Magnet at CERN
por: Willering, G P, et al.
Publicado: (2017) -
LHC IR Upgrade Nb-Ti, 120mm Aperture Model Quadrupole Test Results at 1.8K
por: Kirby, G A, et al.
Publicado: (2014) -
AC Loss in the Superconducting Cables of the CERN Fast Cycled Magnet Prototype
por: Borgnolutti, F, et al.
Publicado: (2012)