Cargando…

IBL Overview

The ATLAS IBL project is reaching a completion phase with the integration of the staves around the IPT and beam pipe structure. The installation and insertion into the Pixel will be done in May with a tight schedule constraint. This talk will give an overview of the project including the production...

Descripción completa

Detalles Bibliográficos
Autor principal: Ferrere, D
Lenguaje:eng
Publicado: 2014
Materias:
Acceso en línea:http://cds.cern.ch/record/1664544
Descripción
Sumario:The ATLAS IBL project is reaching a completion phase with the integration of the staves around the IPT and beam pipe structure. The installation and insertion into the Pixel will be done in May with a tight schedule constraint. This talk will give an overview of the project including the production status and the recent issues met like the corrosion problem. The tremendous effort made to recover the production and optimize the time and the available components to test the full on-detector and off-detector chain highlighted very efficient and excellent results. The integration tools and all the engineering efforts are also made to ensure the success of the last operations on the surface and in the cavern.