Cargando…

Resistive Plate Chambers commissioning and performance results for 2011-2013.

Resistive Plate Chambers (RPC) performance results for the period between 2011-2013 are presented. These results include history plots for the RPC relevant variables such as: Cluster Size, Efficiency, percentage of inactive detector during operation, Rates, and Currents. RPC variables are studied as...

Descripción completa

Detalles Bibliográficos
Autor principal: CMS Collaboration
Lenguaje:eng
Publicado: 2014
Materias:
Acceso en línea:http://cds.cern.ch/record/1667879
_version_ 1780935466153934848
author CMS Collaboration
author_facet CMS Collaboration
author_sort CMS Collaboration
collection CERN
description Resistive Plate Chambers (RPC) performance results for the period between 2011-2013 are presented. These results include history plots for the RPC relevant variables such as: Cluster Size, Efficiency, percentage of inactive detector during operation, Rates, and Currents. RPC variables are studied as function of relevant parameters such as the averaged instantaneous luminosity of the LHC, time, and CMS cavern pressure. Results obtained with the monitoring tools used by CMS such as the Web Based Monitoring tool (WBM) are also shown. RPC Background rates measured during 2010, 2011, and 2012 are presented and compared. Preparations for the 2015 Run include the installation of a new couple of disks of RPCs in the endcap regions, results obtained during quality control campaigns for the new RPCs are also presented, these results include High voltage scans that probe the quality and standards of the RPC construction procedures, as well as tests on chamber gas leaks and current behavior for the new chambers. Basic parameters such as cluster size and efficiency are also reported for these chambers.
id cern-1667879
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2014
record_format invenio
spelling cern-16678792019-09-30T06:29:59Zhttp://cds.cern.ch/record/1667879engCMS CollaborationResistive Plate Chambers commissioning and performance results for 2011-2013.Detectors and Experimental TechniquesResistive Plate Chambers (RPC) performance results for the period between 2011-2013 are presented. These results include history plots for the RPC relevant variables such as: Cluster Size, Efficiency, percentage of inactive detector during operation, Rates, and Currents. RPC variables are studied as function of relevant parameters such as the averaged instantaneous luminosity of the LHC, time, and CMS cavern pressure. Results obtained with the monitoring tools used by CMS such as the Web Based Monitoring tool (WBM) are also shown. RPC Background rates measured during 2010, 2011, and 2012 are presented and compared. Preparations for the 2015 Run include the installation of a new couple of disks of RPCs in the endcap regions, results obtained during quality control campaigns for the new RPCs are also presented, these results include High voltage scans that probe the quality and standards of the RPC construction procedures, as well as tests on chamber gas leaks and current behavior for the new chambers. Basic parameters such as cluster size and efficiency are also reported for these chambers.CMS-DP-2014-003CERN-CMS-DP-2014-003oai:cds.cern.ch:16678792014-03-10
spellingShingle Detectors and Experimental Techniques
CMS Collaboration
Resistive Plate Chambers commissioning and performance results for 2011-2013.
title Resistive Plate Chambers commissioning and performance results for 2011-2013.
title_full Resistive Plate Chambers commissioning and performance results for 2011-2013.
title_fullStr Resistive Plate Chambers commissioning and performance results for 2011-2013.
title_full_unstemmed Resistive Plate Chambers commissioning and performance results for 2011-2013.
title_short Resistive Plate Chambers commissioning and performance results for 2011-2013.
title_sort resistive plate chambers commissioning and performance results for 2011-2013.
topic Detectors and Experimental Techniques
url http://cds.cern.ch/record/1667879
work_keys_str_mv AT cmscollaboration resistiveplatechamberscommissioningandperformanceresultsfor20112013