Cargando…
Resistive Plate Chambers commissioning and performance results for 2011-2013.
Resistive Plate Chambers (RPC) performance results for the period between 2011-2013 are presented. These results include history plots for the RPC relevant variables such as: Cluster Size, Efficiency, percentage of inactive detector during operation, Rates, and Currents. RPC variables are studied as...
Autor principal: | CMS Collaboration |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1667879 |
Ejemplares similares
-
Resistive Plate Chambers commissioning and performance results for 2015
por: CMS Collaboration
Publicado: (2016) -
Performance of the CMS Resistive Plate Chambers (RPC) in 2011
por: CMS Collaboration
Publicado: (2012) -
Performance of the CMS level 1 Resistive Plate Chamber (RPC) trigger in 2011
por: CMS Collaboration
Publicado: (2012) -
Resistive plate chamber commissioning and performance in CMS
por: Roselli, G, et al.
Publicado: (2009) -
Performance and Operation of the ATLAS Resistive Plate Chambers Detector in 2011
por: Polini, A
Publicado: (2012)