Cargando…
Operational Experience with a PLC Based Positioning System for a LHC Extraction Protection Element
The LHC Beam Dumping System (LBDS) nominally dumps the beam synchronously with the passage of the particle free beam abort gap at the beam dump extraction kickers.
Autores principales: | Boucly, C, Borburgh, J, Bracco, C, Carlier, E, Magnin, N, Voumard, N |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1697000 |
Ejemplares similares
-
LHC beam dumping system: status and readiness for LHC Run 2
por: Magnin, N, et al.
Publicado: (2014) -
Changes to the LHC Beam Dumping System for LHC Run 2
por: Uythoven, Jan, et al.
Publicado: (2015) -
Commissioning of the Control System for the LHC Beam Dump Kicker System
por: Carlier, E, et al.
Publicado: (2010) -
Integration of PLC and PXI control systems
por: Antoine, Alain, et al.
Publicado: (2018) -
First Operational Experience with the LHC Beam Dump Trigger Synchronisation Unit
por: Antoine, A, et al.
Publicado: (2011)