Cargando…
First commissioning experience with the LINAC4 3 MeV front-end at CERN
Linac4 is a normal-conducting 160 MeV H- linear accelerator presently under construction at CERN. It will replace the present 50 MeV Linac2 as injector of the proton accelerator complex as part of a project to increase the LHC luminosity. The Linac front-end, composed of a 45 keV ion source, a...
Autores principales: | , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1699830 |
_version_ | 1780936221864755200 |
---|---|
author | Lallement, J B Akroh, A Bellodi, G Comblin, J F Dimov, V A Granemann Souza, E Lettry, J Lombardi, A M Midttun, O Ovalle, E Raich, U Roncarolo, F Rossi, C Sanchez Alvarez, R Scrivens, C A Valerio-Lizarraga, C A Vretenar, M Yarmohammadi Satri, M |
author_facet | Lallement, J B Akroh, A Bellodi, G Comblin, J F Dimov, V A Granemann Souza, E Lettry, J Lombardi, A M Midttun, O Ovalle, E Raich, U Roncarolo, F Rossi, C Sanchez Alvarez, R Scrivens, C A Valerio-Lizarraga, C A Vretenar, M Yarmohammadi Satri, M |
author_sort | Lallement, J B |
collection | CERN |
description | Linac4 is a normal-conducting 160 MeV H- linear accelerator presently under construction at CERN. It will replace the present 50 MeV Linac2 as injector of the proton accelerator complex as part of a project to increase the LHC luminosity. The Linac front-end, composed of a 45 keV ion source, a Low Energy Beam Transport (LEBT), a 352.2 MHz Radio Frequency Quadrupole (RFQ) and a Medium Energy Beam Transport (MEBT) housing a beam chopper, have been commissioned at the 3 MeV test stand during the first half of 2013. The status of the installation and the results of the first commissioning stage are presented in this paper. |
id | cern-1699830 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2013 |
record_format | invenio |
spelling | cern-16998302022-08-17T13:30:23Zhttp://cds.cern.ch/record/1699830engLallement, J BAkroh, ABellodi, GComblin, J FDimov, V AGranemann Souza, ELettry, JLombardi, A MMidttun, OOvalle, ERaich, URoncarolo, FRossi, CSanchez Alvarez, RScrivens, C AValerio-Lizarraga, C AVretenar, MYarmohammadi Satri, MFirst commissioning experience with the LINAC4 3 MeV front-end at CERNAccelerators and Storage RingsLinac4 is a normal-conducting 160 MeV H- linear accelerator presently under construction at CERN. It will replace the present 50 MeV Linac2 as injector of the proton accelerator complex as part of a project to increase the LHC luminosity. The Linac front-end, composed of a 45 keV ion source, a Low Energy Beam Transport (LEBT), a 352.2 MHz Radio Frequency Quadrupole (RFQ) and a Medium Energy Beam Transport (MEBT) housing a beam chopper, have been commissioned at the 3 MeV test stand during the first half of 2013. The status of the installation and the results of the first commissioning stage are presented in this paper.oai:cds.cern.ch:16998302013 |
spellingShingle | Accelerators and Storage Rings Lallement, J B Akroh, A Bellodi, G Comblin, J F Dimov, V A Granemann Souza, E Lettry, J Lombardi, A M Midttun, O Ovalle, E Raich, U Roncarolo, F Rossi, C Sanchez Alvarez, R Scrivens, C A Valerio-Lizarraga, C A Vretenar, M Yarmohammadi Satri, M First commissioning experience with the LINAC4 3 MeV front-end at CERN |
title | First commissioning experience with the LINAC4 3 MeV front-end at CERN |
title_full | First commissioning experience with the LINAC4 3 MeV front-end at CERN |
title_fullStr | First commissioning experience with the LINAC4 3 MeV front-end at CERN |
title_full_unstemmed | First commissioning experience with the LINAC4 3 MeV front-end at CERN |
title_short | First commissioning experience with the LINAC4 3 MeV front-end at CERN |
title_sort | first commissioning experience with the linac4 3 mev front-end at cern |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1699830 |
work_keys_str_mv | AT lallementjb firstcommissioningexperiencewiththelinac43mevfrontendatcern AT akroha firstcommissioningexperiencewiththelinac43mevfrontendatcern AT bellodig firstcommissioningexperiencewiththelinac43mevfrontendatcern AT comblinjf firstcommissioningexperiencewiththelinac43mevfrontendatcern AT dimovva firstcommissioningexperiencewiththelinac43mevfrontendatcern AT granemannsouzae firstcommissioningexperiencewiththelinac43mevfrontendatcern AT lettryj firstcommissioningexperiencewiththelinac43mevfrontendatcern AT lombardiam firstcommissioningexperiencewiththelinac43mevfrontendatcern AT midttuno firstcommissioningexperiencewiththelinac43mevfrontendatcern AT ovallee firstcommissioningexperiencewiththelinac43mevfrontendatcern AT raichu firstcommissioningexperiencewiththelinac43mevfrontendatcern AT roncarolof firstcommissioningexperiencewiththelinac43mevfrontendatcern AT rossic firstcommissioningexperiencewiththelinac43mevfrontendatcern AT sanchezalvarezr firstcommissioningexperiencewiththelinac43mevfrontendatcern AT scrivensca firstcommissioningexperiencewiththelinac43mevfrontendatcern AT valeriolizarragaca firstcommissioningexperiencewiththelinac43mevfrontendatcern AT vretenarm firstcommissioningexperiencewiththelinac43mevfrontendatcern AT yarmohammadisatrim firstcommissioningexperiencewiththelinac43mevfrontendatcern |