Cargando…
The CLIC project: status and prospects
Following the feasibility demonstration of the novel CLIC technology and the publication in 2012 of a CLIC Conceptual Design Report for a Multi-TeV Linear Collider to be built in stages, a new phase towards a technical design is being launched by a global collaboration of volunteer institutes. This...
Autor principal: | Adli, E |
---|---|
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1701084 |
Ejemplares similares
-
Status and Future Prospects of CLIC
por: Döbert, S
Publicado: (2009) -
Alignment Tolerances for the CLIC Decelerator
por: Adli, E, et al.
Publicado: (2008) -
Status of an automatic Beam Steering for the CLIC Test Facility 3
por: Adli, E, et al.
Publicado: (2008) -
Status of Wakefield Monitor Experiments at the CLIC Test Facility
por: Lillestøl, Reidar, et al.
Publicado: (2016) -
CLIC decelerator instrumentation: a first look
por: Adli, E
Publicado: (2007)