Cargando…
RF Design and Tuning of Linac4 RFQ
Linac4 is scheduled to deliver 160 MeV H– beam to LHC injection chain by year 2015. The first stage of Linac4 is a 352 MHz, 3-meter long Radio Frequency Quadrupole (RFQ) accelerator [1]. It will accelerate the 70 mA, 45 keV H– beam from the RF source up to 3 MeV energy. Fabrication of RFQ, which sta...
Autores principales: | France, A C, Desmons, M, Piquet, O, Rossi, C |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1701121 |
Ejemplares similares
-
RF Tuning of the LINAC4 RFQ
por: Piquet, Olivier, et al.
Publicado: (2013) -
The RF Design of the Linac4 RFQ
por: Piquet, Olivier, et al.
Publicado: (2010) -
Assembly and RF Tuning of the Linac4 RFQ at CERN
por: Rossi, C, et al.
Publicado: (2013) -
Progress in the fabrication of the RFQ accelerator for the CERN Linac4
por: Rossi, C, et al.
Publicado: (2010) -
Commissioning and Operational Experience Gained with the Linac4 RFQ at CERN
por: Rossi, Carlo, et al.
Publicado: (2014)