Reliability Analysis of the new Link between the Beam Interlock System and the LHC Beam Dumping System: Zuverlässigkeitsanalyse der neuen Verbindung zwischen dem Beam Interlock System und dem LHC Beam Dumping System

The nominal stored energy in each LHC beam is 360 MJ, surpassing the beam energy of other accelerators by orders of magnitude. This energy threatens to damage accelerator components in case of uncontrolled beam losses To avoid damage of accelerator equipment due to impacting beam, the controlled rem...

Descripción completa

Detalles Bibliográficos
Autor principal: Vatansever, Volkan
Lenguaje:eng
Publicado: 2014
Materias:
Acceso en línea:http://cds.cern.ch/record/1704519
_version_ 1780936392223752192
author Vatansever, Volkan
author_facet Vatansever, Volkan
author_sort Vatansever, Volkan
collection CERN
description The nominal stored energy in each LHC beam is 360 MJ, surpassing the beam energy of other accelerators by orders of magnitude. This energy threatens to damage accelerator components in case of uncontrolled beam losses To avoid damage of accelerator equipment due to impacting beam, the controlled removal of the LHC beams from the collider rings towards the dump block must be guaranteed at all times. Therefore, the LHC Beam Dumping System was built according to high reliability standards. To further reduce the risk of incapability to dump the beams in case of correlated failures in the redundant system, a new direct link from the LHC Beam Interlock System to the Re-triggering Lines of the LHC Beam Dumping System will be implemented for the startup with beam in 2015. This link represents a diverse redundancy to the current implementation, which should neither significantly increase the risk for so-called Asynchronous Beam Dumps nor compromise machine availability. Therefore, a reliability analysis down to the component level has been performed for this new link. In this thesis the applied methods and the results of this analysis will be discussed in detail. The hardware implementation and the system integration will be analysed.
id cern-1704519
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2014
record_format invenio
spelling cern-17045192019-09-30T06:29:59Zhttp://cds.cern.ch/record/1704519engVatansever, VolkanReliability Analysis of the new Link between the Beam Interlock System and the LHC Beam Dumping System: Zuverlässigkeitsanalyse der neuen Verbindung zwischen dem Beam Interlock System und dem LHC Beam Dumping SystemAccelerators and Storage RingsThe nominal stored energy in each LHC beam is 360 MJ, surpassing the beam energy of other accelerators by orders of magnitude. This energy threatens to damage accelerator components in case of uncontrolled beam losses To avoid damage of accelerator equipment due to impacting beam, the controlled removal of the LHC beams from the collider rings towards the dump block must be guaranteed at all times. Therefore, the LHC Beam Dumping System was built according to high reliability standards. To further reduce the risk of incapability to dump the beams in case of correlated failures in the redundant system, a new direct link from the LHC Beam Interlock System to the Re-triggering Lines of the LHC Beam Dumping System will be implemented for the startup with beam in 2015. This link represents a diverse redundancy to the current implementation, which should neither significantly increase the risk for so-called Asynchronous Beam Dumps nor compromise machine availability. Therefore, a reliability analysis down to the component level has been performed for this new link. In this thesis the applied methods and the results of this analysis will be discussed in detail. The hardware implementation and the system integration will be analysed.CERN-THESIS-2014-042oai:cds.cern.ch:17045192014-05-28T11:43:42Z
spellingShingle Accelerators and Storage Rings
Vatansever, Volkan
Reliability Analysis of the new Link between the Beam Interlock System and the LHC Beam Dumping System: Zuverlässigkeitsanalyse der neuen Verbindung zwischen dem Beam Interlock System und dem LHC Beam Dumping System
title Reliability Analysis of the new Link between the Beam Interlock System and the LHC Beam Dumping System: Zuverlässigkeitsanalyse der neuen Verbindung zwischen dem Beam Interlock System und dem LHC Beam Dumping System
title_full Reliability Analysis of the new Link between the Beam Interlock System and the LHC Beam Dumping System: Zuverlässigkeitsanalyse der neuen Verbindung zwischen dem Beam Interlock System und dem LHC Beam Dumping System
title_fullStr Reliability Analysis of the new Link between the Beam Interlock System and the LHC Beam Dumping System: Zuverlässigkeitsanalyse der neuen Verbindung zwischen dem Beam Interlock System und dem LHC Beam Dumping System
title_full_unstemmed Reliability Analysis of the new Link between the Beam Interlock System and the LHC Beam Dumping System: Zuverlässigkeitsanalyse der neuen Verbindung zwischen dem Beam Interlock System und dem LHC Beam Dumping System
title_short Reliability Analysis of the new Link between the Beam Interlock System and the LHC Beam Dumping System: Zuverlässigkeitsanalyse der neuen Verbindung zwischen dem Beam Interlock System und dem LHC Beam Dumping System
title_sort reliability analysis of the new link between the beam interlock system and the lhc beam dumping system: zuverlässigkeitsanalyse der neuen verbindung zwischen dem beam interlock system und dem lhc beam dumping system
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1704519
work_keys_str_mv AT vatansevervolkan reliabilityanalysisofthenewlinkbetweenthebeaminterlocksystemandthelhcbeamdumpingsystemzuverlassigkeitsanalysederneuenverbindungzwischendembeaminterlocksystemunddemlhcbeamdumpingsystem