Cargando…
Reliability Analysis of the new Link between the Beam Interlock System and the LHC Beam Dumping System: Zuverlässigkeitsanalyse der neuen Verbindung zwischen dem Beam Interlock System und dem LHC Beam Dumping System
The nominal stored energy in each LHC beam is 360 MJ, surpassing the beam energy of other accelerators by orders of magnitude. This energy threatens to damage accelerator components in case of uncontrolled beam losses To avoid damage of accelerator equipment due to impacting beam, the controlled rem...
Autor principal: | Vatansever, Volkan |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1704519 |
Ejemplares similares
-
Implementation of a Direct Link between the LHC Beam Interlock System and the LHC Beam Dumping System Re-Triggering Lines
por: Gabourin, S, et al.
Publicado: (2014) -
Extension of the SPS Beam Dumping Interlock and Surveillance System
por: Arduini, Gianluigi, et al.
Publicado: (1997) -
LHC beam dumping system
por: Carlier, E, et al.
Publicado: (2017) -
Reliability study of the Controls Interlocks Beam Dumping System CIBDS V5
por: Blumenschein, Miriam Ruth
Publicado: (2017) -
The Beam Energy Tracking System of the LHC Beam Dumping System
por: Barlow, R A, et al.
Publicado: (2005)