A HTS dipole insert coil constructed

This report is the deliverable report 7.4.1 “A HTS dipole insert coil constructed“. The report has three parts: “Design report for the HTS dipole insert”, “One insert pancake prototype coil constructed with the setup for a high field test”, and “All insert components ordered”. The three report parts...

Descripción completa

Detalles Bibliográficos
Autores principales: Ballarino, A, Devaux, M, Rey, J M, Stenvall, A, Sorbi, M, Tixador, P
Formato: info:eu-repo/semantics/article
Lenguaje:eng
Publicado: 2013
Materias:
Acceso en línea:http://cds.cern.ch/record/1708827
_version_ 1780936614587924480
author Ballarino, A
Devaux, M
Rey, J M
Stenvall, A
Sorbi, M
Tixador, P
author_facet Ballarino, A
Devaux, M
Rey, J M
Stenvall, A
Sorbi, M
Tixador, P
author_sort Ballarino, A
collection CERN
description This report is the deliverable report 7.4.1 “A HTS dipole insert coil constructed“. The report has three parts: “Design report for the HTS dipole insert”, “One insert pancake prototype coil constructed with the setup for a high field test”, and “All insert components ordered”. The three report parts show that, although the insert construction will be only completed by end 2013, all elements are present for a successful completion and that, given the important investments done by the participants, there is a full commitment of all of them to finish the project
format info:eu-repo/semantics/article
id cern-1708827
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2013
record_format invenio
spelling cern-17088272019-09-30T06:29:59Z http://cds.cern.ch/record/1708827 eng Ballarino, A Devaux, M Rey, J M Stenvall, A Sorbi, M Tixador, P A HTS dipole insert coil constructed Accelerators and Storage Rings 7: Super-conducting High Field Magnets for higher luminosities and energies This report is the deliverable report 7.4.1 “A HTS dipole insert coil constructed“. The report has three parts: “Design report for the HTS dipole insert”, “One insert pancake prototype coil constructed with the setup for a high field test”, and “All insert components ordered”. The three report parts show that, although the insert construction will be only completed by end 2013, all elements are present for a successful completion and that, given the important investments done by the participants, there is a full commitment of all of them to finish the project info:eu-repo/grantAgreement/EC/FP7/227579 info:eu-repo/semantics/openAccess Education Level info:eu-repo/semantics/article http://cds.cern.ch/record/1708827 2013
spellingShingle Accelerators and Storage Rings
7: Super-conducting High Field Magnets for higher luminosities and energies
Ballarino, A
Devaux, M
Rey, J M
Stenvall, A
Sorbi, M
Tixador, P
A HTS dipole insert coil constructed
title A HTS dipole insert coil constructed
title_full A HTS dipole insert coil constructed
title_fullStr A HTS dipole insert coil constructed
title_full_unstemmed A HTS dipole insert coil constructed
title_short A HTS dipole insert coil constructed
title_sort hts dipole insert coil constructed
topic Accelerators and Storage Rings
7: Super-conducting High Field Magnets for higher luminosities and energies
url http://cds.cern.ch/record/1708827
http://cds.cern.ch/record/1708827
work_keys_str_mv AT ballarinoa ahtsdipoleinsertcoilconstructed
AT devauxm ahtsdipoleinsertcoilconstructed
AT reyjm ahtsdipoleinsertcoilconstructed
AT stenvalla ahtsdipoleinsertcoilconstructed
AT sorbim ahtsdipoleinsertcoilconstructed
AT tixadorp ahtsdipoleinsertcoilconstructed
AT ballarinoa htsdipoleinsertcoilconstructed
AT devauxm htsdipoleinsertcoilconstructed
AT reyjm htsdipoleinsertcoilconstructed
AT stenvalla htsdipoleinsertcoilconstructed
AT sorbim htsdipoleinsertcoilconstructed
AT tixadorp htsdipoleinsertcoilconstructed