Cargando…
A HTS dipole insert coil constructed
This report is the deliverable report 7.4.1 “A HTS dipole insert coil constructed“. The report has three parts: “Design report for the HTS dipole insert”, “One insert pancake prototype coil constructed with the setup for a high field test”, and “All insert components ordered”. The three report parts...
Autores principales: | , , , , , |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1708827 |
_version_ | 1780936614587924480 |
---|---|
author | Ballarino, A Devaux, M Rey, J M Stenvall, A Sorbi, M Tixador, P |
author_facet | Ballarino, A Devaux, M Rey, J M Stenvall, A Sorbi, M Tixador, P |
author_sort | Ballarino, A |
collection | CERN |
description | This report is the deliverable report 7.4.1 “A HTS dipole insert coil constructed“. The report has three parts: “Design report for the HTS dipole insert”, “One insert pancake prototype coil constructed with the setup for a high field test”, and “All insert components ordered”. The three report parts show that, although the insert construction will be only completed by end 2013, all elements are present for a successful completion and that, given the important investments done by the participants, there is a full commitment of all of them to finish the project |
format | info:eu-repo/semantics/article |
id | cern-1708827 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2013 |
record_format | invenio |
spelling | cern-17088272019-09-30T06:29:59Z http://cds.cern.ch/record/1708827 eng Ballarino, A Devaux, M Rey, J M Stenvall, A Sorbi, M Tixador, P A HTS dipole insert coil constructed Accelerators and Storage Rings 7: Super-conducting High Field Magnets for higher luminosities and energies This report is the deliverable report 7.4.1 “A HTS dipole insert coil constructed“. The report has three parts: “Design report for the HTS dipole insert”, “One insert pancake prototype coil constructed with the setup for a high field test”, and “All insert components ordered”. The three report parts show that, although the insert construction will be only completed by end 2013, all elements are present for a successful completion and that, given the important investments done by the participants, there is a full commitment of all of them to finish the project info:eu-repo/grantAgreement/EC/FP7/227579 info:eu-repo/semantics/openAccess Education Level info:eu-repo/semantics/article http://cds.cern.ch/record/1708827 2013 |
spellingShingle | Accelerators and Storage Rings 7: Super-conducting High Field Magnets for higher luminosities and energies Ballarino, A Devaux, M Rey, J M Stenvall, A Sorbi, M Tixador, P A HTS dipole insert coil constructed |
title | A HTS dipole insert coil constructed |
title_full | A HTS dipole insert coil constructed |
title_fullStr | A HTS dipole insert coil constructed |
title_full_unstemmed | A HTS dipole insert coil constructed |
title_short | A HTS dipole insert coil constructed |
title_sort | hts dipole insert coil constructed |
topic | Accelerators and Storage Rings 7: Super-conducting High Field Magnets for higher luminosities and energies |
url | http://cds.cern.ch/record/1708827 http://cds.cern.ch/record/1708827 |
work_keys_str_mv | AT ballarinoa ahtsdipoleinsertcoilconstructed AT devauxm ahtsdipoleinsertcoilconstructed AT reyjm ahtsdipoleinsertcoilconstructed AT stenvalla ahtsdipoleinsertcoilconstructed AT sorbim ahtsdipoleinsertcoilconstructed AT tixadorp ahtsdipoleinsertcoilconstructed AT ballarinoa htsdipoleinsertcoilconstructed AT devauxm htsdipoleinsertcoilconstructed AT reyjm htsdipoleinsertcoilconstructed AT stenvalla htsdipoleinsertcoilconstructed AT sorbim htsdipoleinsertcoilconstructed AT tixadorp htsdipoleinsertcoilconstructed |