Cargando…

HTS 20 M 600 a link assembled

The final deliverable of the EuCARD Task 7.5 activity is a 20 m long Superconducting Link made of HTS (High Temperature Superconducting) cables of the type and in quantity as required for the powering of the LHC superconducting circuits fed from LHC P7 (50 cables rated at 600 A). Following an intens...

Descripción completa

Detalles Bibliográficos
Autor principal: Ballarino, A
Formato: info:eu-repo/semantics/article
Lenguaje:eng
Publicado: 2013
Materias:
Acceso en línea:http://cds.cern.ch/record/1708828
_version_ 1780936614811271168
author Ballarino, A
author_facet Ballarino, A
author_sort Ballarino, A
collection CERN
description The final deliverable of the EuCARD Task 7.5 activity is a 20 m long Superconducting Link made of HTS (High Temperature Superconducting) cables of the type and in quantity as required for the powering of the LHC superconducting circuits fed from LHC P7 (50 cables rated at 600 A). Following an intense R&D activity, which included the study of novel concepts of cables made from HTS tape conductor and the development and test of prototype units, the final deliverable was successfully assembled at CERN in May 2013. This document reports on the activity that culminated with the assembly of the 20 m long HTS Superconducting Link.
format info:eu-repo/semantics/article
id cern-1708828
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2013
record_format invenio
spelling cern-17088282019-09-30T06:29:59Z http://cds.cern.ch/record/1708828 eng Ballarino, A HTS 20 M 600 a link assembled Accelerators and Storage Rings 7: Super-conducting High Field Magnets for higher luminosities and energies The final deliverable of the EuCARD Task 7.5 activity is a 20 m long Superconducting Link made of HTS (High Temperature Superconducting) cables of the type and in quantity as required for the powering of the LHC superconducting circuits fed from LHC P7 (50 cables rated at 600 A). Following an intense R&D activity, which included the study of novel concepts of cables made from HTS tape conductor and the development and test of prototype units, the final deliverable was successfully assembled at CERN in May 2013. This document reports on the activity that culminated with the assembly of the 20 m long HTS Superconducting Link. info:eu-repo/grantAgreement/EC/FP7/227579 info:eu-repo/semantics/openAccess Education Level info:eu-repo/semantics/article http://cds.cern.ch/record/1708828 2013
spellingShingle Accelerators and Storage Rings
7: Super-conducting High Field Magnets for higher luminosities and energies
Ballarino, A
HTS 20 M 600 a link assembled
title HTS 20 M 600 a link assembled
title_full HTS 20 M 600 a link assembled
title_fullStr HTS 20 M 600 a link assembled
title_full_unstemmed HTS 20 M 600 a link assembled
title_short HTS 20 M 600 a link assembled
title_sort hts 20 m 600 a link assembled
topic Accelerators and Storage Rings
7: Super-conducting High Field Magnets for higher luminosities and energies
url http://cds.cern.ch/record/1708828
http://cds.cern.ch/record/1708828
work_keys_str_mv AT ballarinoa hts20m600alinkassembled