Cargando…
Analysis of LHC transfer line trajectory drifts
The LHC is filled from the SPS via two 3 km long transfer lines: TI2 for beam 1 and TI8 for beam 2. In the first years of LHC operation large trajectory variationswere discovered. The sources of bunch-by-bunch and shot-by-shot trajectory variations had been identified and improved by the 2012 LHC ru...
Autores principales: | Drosdal, L, Bartmann, W, Bartosik, H, Bracco, C, Gianfelice, E, Goddard, B, Kain, V, Papaphilippou, Y, Uythoven, J, Wenninger, J |
---|---|
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1709867 |
Ejemplares similares
-
Analysis of LHC Transfer Line Trajectory Drifts
por: Drøsdal, L, et al.
Publicado: (2013) -
Stability of the LHC transfer lines
por: Kain, V, et al.
Publicado: (2011) -
Beam Transfer to LHC with the Low gamma-Transition SPS Optics
por: Vanbavinckhove, G, et al.
Publicado: (2013) -
Beam Transfer to LHC with the Low Gamma-transition SPS Optics
por: Vanbavinckhove, G, et al.
Publicado: (2013) -
Sources and solutions for LHC transfer line stability issues
por: Drosdal, L, et al.
Publicado: (2012)