Cargando…
Prototypes with descriptive report (technical, design and fabrication) of the hardware prepared for the test module
The present report describes the main components of the CLIC Two-Beam Module prototype and the corresponding fabrication process from the engineering design to the assembly. The aim is to validate all the technical systems (e. g. RF, vacuum, alignment, cooling) in an integrated and compact approach....
Autores principales: | , |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1710301 |
_version_ | 1780936690802622464 |
---|---|
author | Gudkov, D Samochkine, A |
author_facet | Gudkov, D Samochkine, A |
author_sort | Gudkov, D |
collection | CERN |
description | The present report describes the main components of the CLIC Two-Beam Module prototype and the corresponding fabrication process from the engineering design to the assembly. The aim is to validate all the technical systems (e. g. RF, vacuum, alignment, cooling) in an integrated and compact approach. This module will undergo to intensive thermo-mechanical tests to simulate the CLIC operating conditions. |
format | info:eu-repo/semantics/article |
id | cern-1710301 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2013 |
record_format | invenio |
spelling | cern-17103012019-09-30T06:29:59Z http://cds.cern.ch/record/1710301 eng Gudkov, D Samochkine, A Prototypes with descriptive report (technical, design and fabrication) of the hardware prepared for the test module Accelerators and Storage Rings 9: Technology for normal conducting higher energy linear accelerators The present report describes the main components of the CLIC Two-Beam Module prototype and the corresponding fabrication process from the engineering design to the assembly. The aim is to validate all the technical systems (e. g. RF, vacuum, alignment, cooling) in an integrated and compact approach. This module will undergo to intensive thermo-mechanical tests to simulate the CLIC operating conditions. info:eu-repo/grantAgreement/EC/FP7/227579 info:eu-repo/semantics/openAccess Education Level info:eu-repo/semantics/article http://cds.cern.ch/record/1710301 2013 |
spellingShingle | Accelerators and Storage Rings 9: Technology for normal conducting higher energy linear accelerators Gudkov, D Samochkine, A Prototypes with descriptive report (technical, design and fabrication) of the hardware prepared for the test module |
title | Prototypes with descriptive report (technical, design and fabrication) of the hardware prepared for the test module |
title_full | Prototypes with descriptive report (technical, design and fabrication) of the hardware prepared for the test module |
title_fullStr | Prototypes with descriptive report (technical, design and fabrication) of the hardware prepared for the test module |
title_full_unstemmed | Prototypes with descriptive report (technical, design and fabrication) of the hardware prepared for the test module |
title_short | Prototypes with descriptive report (technical, design and fabrication) of the hardware prepared for the test module |
title_sort | prototypes with descriptive report (technical, design and fabrication) of the hardware prepared for the test module |
topic | Accelerators and Storage Rings 9: Technology for normal conducting higher energy linear accelerators |
url | http://cds.cern.ch/record/1710301 http://cds.cern.ch/record/1710301 |
work_keys_str_mv | AT gudkovd prototypeswithdescriptivereporttechnicaldesignandfabricationofthehardwarepreparedforthetestmodule AT samochkinea prototypeswithdescriptivereporttechnicaldesignandfabricationofthehardwarepreparedforthetestmodule |