Cargando…
RF phase monitor final report
In the CLIC two beam acceleration scheme the Main Beam must be precisely synchronized with respect to the RF power produced by the Drive Beam. Timing errors would have an impact on the collider performances. The Drive Beam phase errors should be controlled, by means of a feed forward system, within...
Autores principales: | Marcellini, F, Anderson, A |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1710307 |
Ejemplares similares
-
Electro optical monitor final report
por: Dehler, M, et al.
Publicado: (2013) -
Beam Phase Monitor for CLIC and CTF3: pick-up design
por: Marcellini, F
Publicado: (2009) -
The CLIC Drive Beam Phase Monitor
por: Marcellini, F, et al.
Publicado: (2010) -
Final Focus Test Stand final report
por: Jeremie, A, et al.
Publicado: (2013) -
Drive Beam Phase Measurement using RF data from the PETS
por: Ogburn, Daniel, et al.
Publicado: (2011)