Cargando…
Electro optical monitor final report
In the CLIC two beam acceleration scheme the Main Beam must be precisely synchronized with respect to the RF power produced by the Drive Beam. Timing errors would have an impact on the collider performances. The Drive Beam phase errors should be controlled, by means of a feed forward system, within...
Autores principales: | Dehler, M, Arsov, V |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1710309 |
Ejemplares similares
-
RF phase monitor final report
por: Marcellini, F, et al.
Publicado: (2013) -
Final Focus Test Stand final report
por: Jeremie, A, et al.
Publicado: (2013) -
CLIC Quadrupole Module final report
por: Artoos, K, et al.
Publicado: (2013) -
Interaction point feedback design and integrated simulations to stabilize the CLIC final focus
por: Balik, G, et al.
Publicado: (2011) -
12 GHz Phase Monitor
por: Andersson, A
Publicado: (2009)