Cargando…
Results of SC proton cavity tests (B = 1 and B = 0.65)
The two superconducting cavities were carefully designed for challenging performance. They were fabricated in industry with intermediate tests and specialized processing in CEA and CNRS. The results are promising, except for a degradation of the field flatness of the low velocity cavity, after elect...
Autor principal: | |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1710311 |
_version_ | 1780936692558987264 |
---|---|
author | Peauger, F et al |
author_facet | Peauger, F et al |
author_sort | Peauger, F et al |
collection | CERN |
description | The two superconducting cavities were carefully designed for challenging performance. They were fabricated in industry with intermediate tests and specialized processing in CEA and CNRS. The results are promising, except for a degradation of the field flatness of the low velocity cavity, after electron-beam welding. This might reduce the accelerating gradient. Due to delays in manufacturing, the final performance tests will be carried out in the coming months. |
format | info:eu-repo/semantics/article |
id | cern-1710311 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2013 |
record_format | invenio |
spelling | cern-17103112019-09-30T06:29:59Z http://cds.cern.ch/record/1710311 eng Peauger, F et al Results of SC proton cavity tests (B = 1 and B = 0.65) Accelerators and Storage Rings 10: SC RF technology for higher intensity proton accelerators and higher energy electron linacs The two superconducting cavities were carefully designed for challenging performance. They were fabricated in industry with intermediate tests and specialized processing in CEA and CNRS. The results are promising, except for a degradation of the field flatness of the low velocity cavity, after electron-beam welding. This might reduce the accelerating gradient. Due to delays in manufacturing, the final performance tests will be carried out in the coming months. info:eu-repo/grantAgreement/EC/FP7/227579 info:eu-repo/semantics/openAccess Education Level info:eu-repo/semantics/article http://cds.cern.ch/record/1710311 2013 |
spellingShingle | Accelerators and Storage Rings 10: SC RF technology for higher intensity proton accelerators and higher energy electron linacs Peauger, F et al Results of SC proton cavity tests (B = 1 and B = 0.65) |
title | Results of SC proton cavity tests (B = 1 and B = 0.65) |
title_full | Results of SC proton cavity tests (B = 1 and B = 0.65) |
title_fullStr | Results of SC proton cavity tests (B = 1 and B = 0.65) |
title_full_unstemmed | Results of SC proton cavity tests (B = 1 and B = 0.65) |
title_short | Results of SC proton cavity tests (B = 1 and B = 0.65) |
title_sort | results of sc proton cavity tests (b = 1 and b = 0.65) |
topic | Accelerators and Storage Rings 10: SC RF technology for higher intensity proton accelerators and higher energy electron linacs |
url | http://cds.cern.ch/record/1710311 http://cds.cern.ch/record/1710311 |
work_keys_str_mv | AT peaugerfetal resultsofscprotoncavitytestsb1andb065 |