D10.8.1: Test and operation of the couplers preparation procedure
As far as the Task 10.8.1 is concerned the activity was to define the process of the automatic couplers cleaning, to have a full review of the different phases and to establish the necessary hardware components. After this the design of the machine and of its components has been realised. This has p...
Autor principal: | Napoly, O |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1710430 |
Ejemplares similares
-
Diode Down-mixing of HOM Coupler Signals for Beam Position Determination in 1.3-GHz- and 3.9-GHz-Cavities at FLASH
por: Glock, H W, et al.
Publicado: (2011) -
M10.6.8: Integration of downconverters and upconverters in RTM (ATCA)
por: Czuba, K, et al.
Publicado: (2011) -
Status of the SRF Gun Operation at ELBE
por: Teichert, J, et al.
Publicado: (2010) -
Operation of the superconducting RF photo gun at ELBE
por: Teichert, J, et al.
Publicado: (2011) -
Operation of the superconducting RF photo gun at ELBE
por: Teichert, J, et al.
Publicado: (2012)