Cargando…
M10.3.4: CLIC crab cavity specifications completed
The starting point of Sub-task 2 is to document the currently anticipated requirements for the CLIC crab cavity system. This milestone concerns completion of the basic specifications for the CLIC crab cavity system. This comprises kick, power requirement, phase and amplitude stability, technology ch...
Autores principales: | , , , , |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1710447 |
_version_ | 1780936703980077056 |
---|---|
author | Dexter, A Burt, G Ambattu, P Shinton, I Jones, R |
author_facet | Dexter, A Burt, G Ambattu, P Shinton, I Jones, R |
author_sort | Dexter, A |
collection | CERN |
description | The starting point of Sub-task 2 is to document the currently anticipated requirements for the CLIC crab cavity system. This milestone concerns completion of the basic specifications for the CLIC crab cavity system. This comprises kick, power requirement, phase and amplitude stability, technology choice, and RF layout. The wakefield calculations of a baseline CLIC cavity will be used to estimate the required damping of the higher order modes as well as other special modes in crab cavities (the lower and same order modes). |
format | info:eu-repo/semantics/article |
id | cern-1710447 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2010 |
record_format | invenio |
spelling | cern-17104472019-09-30T06:29:59Z http://cds.cern.ch/record/1710447 eng Dexter, A Burt, G Ambattu, P Shinton, I Jones, R M10.3.4: CLIC crab cavity specifications completed Accelerators and Storage Rings 10: SC RF technology for higher intensity proton accelerators and higher energy electron linacs The starting point of Sub-task 2 is to document the currently anticipated requirements for the CLIC crab cavity system. This milestone concerns completion of the basic specifications for the CLIC crab cavity system. This comprises kick, power requirement, phase and amplitude stability, technology choice, and RF layout. The wakefield calculations of a baseline CLIC cavity will be used to estimate the required damping of the higher order modes as well as other special modes in crab cavities (the lower and same order modes). info:eu-repo/grantAgreement/EC/FP7/227579 info:eu-repo/semantics/openAccess Education Level info:eu-repo/semantics/article http://cds.cern.ch/record/1710447 2010 |
spellingShingle | Accelerators and Storage Rings 10: SC RF technology for higher intensity proton accelerators and higher energy electron linacs Dexter, A Burt, G Ambattu, P Shinton, I Jones, R M10.3.4: CLIC crab cavity specifications completed |
title | M10.3.4: CLIC crab cavity specifications completed |
title_full | M10.3.4: CLIC crab cavity specifications completed |
title_fullStr | M10.3.4: CLIC crab cavity specifications completed |
title_full_unstemmed | M10.3.4: CLIC crab cavity specifications completed |
title_short | M10.3.4: CLIC crab cavity specifications completed |
title_sort | m10.3.4: clic crab cavity specifications completed |
topic | Accelerators and Storage Rings 10: SC RF technology for higher intensity proton accelerators and higher energy electron linacs |
url | http://cds.cern.ch/record/1710447 http://cds.cern.ch/record/1710447 |
work_keys_str_mv | AT dextera m1034cliccrabcavityspecificationscompleted AT burtg m1034cliccrabcavityspecificationscompleted AT ambattup m1034cliccrabcavityspecificationscompleted AT shintoni m1034cliccrabcavityspecificationscompleted AT jonesr m1034cliccrabcavityspecificationscompleted |