Cargando…
M10.3.4: CLIC crab cavity specifications completed
The starting point of Sub-task 2 is to document the currently anticipated requirements for the CLIC crab cavity system. This milestone concerns completion of the basic specifications for the CLIC crab cavity system. This comprises kick, power requirement, phase and amplitude stability, technology ch...
Autores principales: | Dexter, A, Burt, G, Ambattu, P, Shinton, I, Jones, R |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1710447 |
Ejemplares similares
-
CLIC CRAB CAVITY SPECIFICATIONS MILESTONE: M10.3.4
por: Ambattu, P, et al.
Publicado: (2010) -
WAKEFIELD DAMPING FOR THE CLIC CRAB CAVITY
por: Ambattu, P, et al.
Publicado: (2009) -
CLIC crab cavity final report
por: Burt, G et al
Publicado: (2013) -
LHC crab cavity final report
por: Burt, G et al
Publicado: (2013) -
NEW CAVITY SHAPE DEVELOPMENTS FOR CRABBING APPLICATIONS
por: Burt, G
Publicado: (2009)