Cargando…
ROB performance in a high luminosity scenario
The first layer of the CMS (Compact Muon Solenoid) DT (Drift Tube) readout system is built around the ROBs (Read Out Boards), which are responsible for the time measurement of the chamber signals to allow reconstruction of charged particle tracks with a resolution of 250 $\mu m$ per cell. ROB boards...
Autor principal: | Cela Ruiz, Jose Manuel |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1712202 |
Ejemplares similares
-
Performance of the ATLAS Tau Trigger in High Luminosity Scenarios
por: Mechnich, J
Publicado: (2011) -
Performance of the ATLAS Tau Trigger in High Luminosity Scenarios
por: Mechnich, Joerg
Publicado: (2011) -
The active ROB complex
por: Böck, R K, et al.
Publicado: (1999) -
Options for the ROB Complex
por: Cranfield, R, et al.
Publicado: (2000) -
ATLAS Trigger/DAQ RobIn Prototype
por: Green, B, et al.
Publicado: (2003)