Cargando…
Commissioning of the MICE RF System
The Muon Ionisation Cooling Experiment (MICE) is being constructed at Rutherford Appleton Laboratory in the UK. The muon beam will be cooled using multiple hydrogen absorbers then reaccelerated using an RF cavity system operating at 201MHz. This paper describes recent progress in commissioning the...
Autores principales: | , , , , , , , , |
---|---|
Formato: | info:eu-repo/semantics/article |
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1712221 |
_version_ | 1780936762237911040 |
---|---|
author | Moss, A. Wheelhouse, A. Stanley, T. White, C. Ronald, K. Whyte, C.G. Dick, A.J. Speirs, D.C. Alsari, S. |
author_facet | Moss, A. Wheelhouse, A. Stanley, T. White, C. Ronald, K. Whyte, C.G. Dick, A.J. Speirs, D.C. Alsari, S. |
author_sort | Moss, A. |
collection | CERN |
description | The Muon Ionisation Cooling Experiment (MICE) is being constructed at Rutherford Appleton Laboratory in the UK. The muon beam will be cooled using multiple hydrogen absorbers then reaccelerated using an RF cavity system operating at 201MHz. This paper describes recent progress in commissioning the amplifier systems at their design operation conditions, installation and operation as part of the MICE project. |
format | info:eu-repo/semantics/article |
id | cern-1712221 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2014 |
record_format | invenio |
spelling | cern-17122212019-09-30T06:29:59Z http://cds.cern.ch/record/1712221 eng Moss, A. Wheelhouse, A. Stanley, T. White, C. Ronald, K. Whyte, C.G. Dick, A.J. Speirs, D.C. Alsari, S. Commissioning of the MICE RF System Accelerators and Storage Rings 7: ICTF R&D Infrastructure 7.1: RFP ICTF RF power infrastructure The Muon Ionisation Cooling Experiment (MICE) is being constructed at Rutherford Appleton Laboratory in the UK. The muon beam will be cooled using multiple hydrogen absorbers then reaccelerated using an RF cavity system operating at 201MHz. This paper describes recent progress in commissioning the amplifier systems at their design operation conditions, installation and operation as part of the MICE project. info:eu-repo/grantAgreement/EC/FP7/261905 info:eu-repo/semantics/openAccess Education Level info:eu-repo/semantics/article http://cds.cern.ch/record/1712221 2014 |
spellingShingle | Accelerators and Storage Rings 7: ICTF R&D Infrastructure 7.1: RFP ICTF RF power infrastructure Moss, A. Wheelhouse, A. Stanley, T. White, C. Ronald, K. Whyte, C.G. Dick, A.J. Speirs, D.C. Alsari, S. Commissioning of the MICE RF System |
title | Commissioning of the MICE RF System |
title_full | Commissioning of the MICE RF System |
title_fullStr | Commissioning of the MICE RF System |
title_full_unstemmed | Commissioning of the MICE RF System |
title_short | Commissioning of the MICE RF System |
title_sort | commissioning of the mice rf system |
topic | Accelerators and Storage Rings 7: ICTF R&D Infrastructure 7.1: RFP ICTF RF power infrastructure |
url | http://cds.cern.ch/record/1712221 http://cds.cern.ch/record/1712221 |
work_keys_str_mv | AT mossa commissioningofthemicerfsystem AT wheelhousea commissioningofthemicerfsystem AT stanleyt commissioningofthemicerfsystem AT whitec commissioningofthemicerfsystem AT ronaldk commissioningofthemicerfsystem AT whytecg commissioningofthemicerfsystem AT dickaj commissioningofthemicerfsystem AT speirsdc commissioningofthemicerfsystem AT alsaris commissioningofthemicerfsystem |