Cargando…

Commissioning of the MICE RF System

The Muon Ionisation Cooling Experiment (MICE) is being constructed at Rutherford Appleton Laboratory in the UK. The muon beam will be cooled using multiple hydrogen absorbers then reaccelerated using an RF cavity system operating at 201MHz. This paper describes recent progress in commissioning the...

Descripción completa

Detalles Bibliográficos
Autores principales: Moss, A., Wheelhouse, A., Stanley, T., White, C., Ronald, K., Whyte, C.G., Dick, A.J., Speirs, D.C., Alsari, S.
Formato: info:eu-repo/semantics/article
Lenguaje:eng
Publicado: 2014
Materias:
Acceso en línea:http://cds.cern.ch/record/1712221
_version_ 1780936762237911040
author Moss, A.
Wheelhouse, A.
Stanley, T.
White, C.
Ronald, K.
Whyte, C.G.
Dick, A.J.
Speirs, D.C.
Alsari, S.
author_facet Moss, A.
Wheelhouse, A.
Stanley, T.
White, C.
Ronald, K.
Whyte, C.G.
Dick, A.J.
Speirs, D.C.
Alsari, S.
author_sort Moss, A.
collection CERN
description The Muon Ionisation Cooling Experiment (MICE) is being constructed at Rutherford Appleton Laboratory in the UK. The muon beam will be cooled using multiple hydrogen absorbers then reaccelerated using an RF cavity system operating at 201MHz. This paper describes recent progress in commissioning the amplifier systems at their design operation conditions, installation and operation as part of the MICE project.
format info:eu-repo/semantics/article
id cern-1712221
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2014
record_format invenio
spelling cern-17122212019-09-30T06:29:59Z http://cds.cern.ch/record/1712221 eng Moss, A. Wheelhouse, A. Stanley, T. White, C. Ronald, K. Whyte, C.G. Dick, A.J. Speirs, D.C. Alsari, S. Commissioning of the MICE RF System Accelerators and Storage Rings 7: ICTF R&D Infrastructure 7.1: RFP ICTF RF power infrastructure The Muon Ionisation Cooling Experiment (MICE) is being constructed at Rutherford Appleton Laboratory in the UK. The muon beam will be cooled using multiple hydrogen absorbers then reaccelerated using an RF cavity system operating at 201MHz. This paper describes recent progress in commissioning the amplifier systems at their design operation conditions, installation and operation as part of the MICE project. info:eu-repo/grantAgreement/EC/FP7/261905 info:eu-repo/semantics/openAccess Education Level info:eu-repo/semantics/article http://cds.cern.ch/record/1712221 2014
spellingShingle Accelerators and Storage Rings
7: ICTF R&D Infrastructure
7.1: RFP ICTF RF power infrastructure
Moss, A.
Wheelhouse, A.
Stanley, T.
White, C.
Ronald, K.
Whyte, C.G.
Dick, A.J.
Speirs, D.C.
Alsari, S.
Commissioning of the MICE RF System
title Commissioning of the MICE RF System
title_full Commissioning of the MICE RF System
title_fullStr Commissioning of the MICE RF System
title_full_unstemmed Commissioning of the MICE RF System
title_short Commissioning of the MICE RF System
title_sort commissioning of the mice rf system
topic Accelerators and Storage Rings
7: ICTF R&D Infrastructure
7.1: RFP ICTF RF power infrastructure
url http://cds.cern.ch/record/1712221
http://cds.cern.ch/record/1712221
work_keys_str_mv AT mossa commissioningofthemicerfsystem
AT wheelhousea commissioningofthemicerfsystem
AT stanleyt commissioningofthemicerfsystem
AT whitec commissioningofthemicerfsystem
AT ronaldk commissioningofthemicerfsystem
AT whytecg commissioningofthemicerfsystem
AT dickaj commissioningofthemicerfsystem
AT speirsdc commissioningofthemicerfsystem
AT alsaris commissioningofthemicerfsystem