Cargando…
Thermal joining studies of CLIC accelerating structures and Establishment of a test bench and studies of thermomechanical behaviour of a CLIC two beam module
The assembly procedure of the CLIC accelerating structures is constituted of several steps, involving ultra-precision machining, heating cycles at very high temperatures and many quality controls necessary to fulfil the very tight technical requirements. Diverse issues are related to the diffusion b...
Autor principal: | Rossi, Fabrizio |
---|---|
Lenguaje: | eng |
Publicado: |
2013
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1712916 |
Ejemplares similares
-
The Drive Beam Accelerator of CLIC
por: Schulte, Daniel
Publicado: (1998) -
The drive beam accelerator of CLIC
por: Schulte, D
Publicado: (1998) -
CLIC Drive Beam Accelerating Structures
por: Wegner, Rolf, et al.
Publicado: (2012) -
Thermal and acoustic effects in CLIC beam absorbers
por: Jeanneret, J B, et al.
Publicado: (1999) -
CLIC test facility: the photocathode test bench
por: Baconnier, Yves, et al.
Publicado: (1989)