The management of large cabling campaigns during the Long Shutdown 1 of LHC

The Large Hadron Collider at CERN entered into its first 18 month-long shutdown period in February 2013. During this period the entire CERN accelerator complex will undergo major consolidation and upgrade works, preparing the machines for LHC operation at nominal energy (7 TeV/beam). One of the most...

Descripción completa

Detalles Bibliográficos
Autores principales: Meroli, Stefano, Machado, Simao, Formenti, Fabio, Frans, Marten, Guillaume, Jean Claude, Ricci, Daniel
Lenguaje:eng
Publicado: 2014
Materias:
Acceso en línea:https://dx.doi.org/10.1088/1748-0221/9/03/C03042
http://cds.cern.ch/record/1753153
_version_ 1780943238006308864
author Meroli, Stefano
Machado, Simao
Formenti, Fabio
Frans, Marten
Guillaume, Jean Claude
Ricci, Daniel
author_facet Meroli, Stefano
Machado, Simao
Formenti, Fabio
Frans, Marten
Guillaume, Jean Claude
Ricci, Daniel
author_sort Meroli, Stefano
collection CERN
description The Large Hadron Collider at CERN entered into its first 18 month-long shutdown period in February 2013. During this period the entire CERN accelerator complex will undergo major consolidation and upgrade works, preparing the machines for LHC operation at nominal energy (7 TeV/beam). One of the most challenging activities concerns the cabling infrastructure (copper and optical fibre cables) serving the CERN data acquisition, networking and control systems. About 1000 kilometres of cables, distributed in different machine areas, will be installed, representing an investment of about 15 MCHF. This implies an extraordinary challenge in terms of project management, including resource and activity planning, work execution and quality control. The preparation phase of this project started well before its implementation, by defining technical solutions and setting financial plans for staff recruitment and material supply. Enhanced task coordination was further implemented by deploying selected competences to form a central support team.
id cern-1753153
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2014
record_format invenio
spelling cern-17531532022-08-10T20:37:37Zdoi:10.1088/1748-0221/9/03/C03042http://cds.cern.ch/record/1753153engMeroli, StefanoMachado, SimaoFormenti, FabioFrans, MartenGuillaume, Jean ClaudeRicci, DanielThe management of large cabling campaigns during the Long Shutdown 1 of LHCEngineeringThe Large Hadron Collider at CERN entered into its first 18 month-long shutdown period in February 2013. During this period the entire CERN accelerator complex will undergo major consolidation and upgrade works, preparing the machines for LHC operation at nominal energy (7 TeV/beam). One of the most challenging activities concerns the cabling infrastructure (copper and optical fibre cables) serving the CERN data acquisition, networking and control systems. About 1000 kilometres of cables, distributed in different machine areas, will be installed, representing an investment of about 15 MCHF. This implies an extraordinary challenge in terms of project management, including resource and activity planning, work execution and quality control. The preparation phase of this project started well before its implementation, by defining technical solutions and setting financial plans for staff recruitment and material supply. Enhanced task coordination was further implemented by deploying selected competences to form a central support team.CERN-OPEN-2014-042oai:cds.cern.ch:17531532014-03-25
spellingShingle Engineering
Meroli, Stefano
Machado, Simao
Formenti, Fabio
Frans, Marten
Guillaume, Jean Claude
Ricci, Daniel
The management of large cabling campaigns during the Long Shutdown 1 of LHC
title The management of large cabling campaigns during the Long Shutdown 1 of LHC
title_full The management of large cabling campaigns during the Long Shutdown 1 of LHC
title_fullStr The management of large cabling campaigns during the Long Shutdown 1 of LHC
title_full_unstemmed The management of large cabling campaigns during the Long Shutdown 1 of LHC
title_short The management of large cabling campaigns during the Long Shutdown 1 of LHC
title_sort management of large cabling campaigns during the long shutdown 1 of lhc
topic Engineering
url https://dx.doi.org/10.1088/1748-0221/9/03/C03042
http://cds.cern.ch/record/1753153
work_keys_str_mv AT merolistefano themanagementoflargecablingcampaignsduringthelongshutdown1oflhc
AT machadosimao themanagementoflargecablingcampaignsduringthelongshutdown1oflhc
AT formentifabio themanagementoflargecablingcampaignsduringthelongshutdown1oflhc
AT fransmarten themanagementoflargecablingcampaignsduringthelongshutdown1oflhc
AT guillaumejeanclaude themanagementoflargecablingcampaignsduringthelongshutdown1oflhc
AT riccidaniel themanagementoflargecablingcampaignsduringthelongshutdown1oflhc
AT merolistefano managementoflargecablingcampaignsduringthelongshutdown1oflhc
AT machadosimao managementoflargecablingcampaignsduringthelongshutdown1oflhc
AT formentifabio managementoflargecablingcampaignsduringthelongshutdown1oflhc
AT fransmarten managementoflargecablingcampaignsduringthelongshutdown1oflhc
AT guillaumejeanclaude managementoflargecablingcampaignsduringthelongshutdown1oflhc
AT riccidaniel managementoflargecablingcampaignsduringthelongshutdown1oflhc