The management of large cabling campaigns during the Long Shutdown 1 of LHC
The Large Hadron Collider at CERN entered into its first 18 month-long shutdown period in February 2013. During this period the entire CERN accelerator complex will undergo major consolidation and upgrade works, preparing the machines for LHC operation at nominal energy (7 TeV/beam). One of the most...
Autores principales: | Meroli, Stefano, Machado, Simao, Formenti, Fabio, Frans, Marten, Guillaume, Jean Claude, Ricci, Daniel |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1748-0221/9/03/C03042 http://cds.cern.ch/record/1753153 |
Ejemplares similares
-
Evolution of optical fibre cabling components at CERN: Performance and technology trends analysis
por: Shoaie, Mohammad Amin, et al.
Publicado: (2018) -
Long shutdown 2 LHC smoothing status and data analysis
por: Fuchs, Jean-Frederic, et al.
Publicado: (2022) -
Summary of the Post-Long Shutdown 2 LHC Hardware Commissioning Campaign
por: Apollonio, Andrea, et al.
Publicado: (2022) -
Optical Fibre Infrastructure Evolution from LS1 to the Future
por: Blanc, Jeremy, et al.
Publicado: (2022) -
Evolving trends in CERN optical fibre infrastructure
por: Shoaie, M A, et al.
Publicado: (2017)