Cargando…
ATLAS computing challenges before the next LHC run
ATLAS software and computing is in a period of intensive evolution. The current long shutdown presents an opportunity to assimilate lessons from the very successful Run 1 (2009-2013) and to prepare for the substantially increased computing requirements for Run 2 (from spring 2015). Run 2 will bring...
Autor principal: | Barberis, D |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1016/j.nuclphysbps.2015.09.150 http://cds.cern.ch/record/1757256 |
Ejemplares similares
-
ATLAS computing challenges before the next LHC run
por: Barberis, D
Publicado: (2014) -
ATLAS LAr Calorimeter Performance in LHC Run-2 and Electronics Upgrades for next Runs
por: McKay, Madalyn Ann
Publicado: (2019) -
ATLAS LAr Calorimeter Performance in LHC Run 2 and Electronics Upgrades for next Runs
por: McKay, Madalyn Ann
Publicado: (2019) -
ATLAS Distributed Computing in LHC Run2
por: Campana, Simone
Publicado: (2015) -
ATLAS Distributed Computing in LHC Run2
por: Campana, Simone
Publicado: (2015)