Cargando…
Two devices for operator interaction in the central control of the new CERN accelerator
Autores principales: | Beck, Frank, Stumpe, Bent |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
1973
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-1973-006 http://cds.cern.ch/record/186242 |
Ejemplares similares
-
SPS Controls: A Part of Touch Screen History
por: Stumpe, Bent
Publicado: (2017) -
Installation and operation of the new rf system for lepton acceleration in the CERN SPS
por: Faugeras, Paul E, et al.
Publicado: (1990) -
CERN accelerator operations' Planning Manager and Dashboard
por: Matli, Emanuele, et al.
Publicado: (2019) -
Operation Statistics of the CERN Accelerators Complex for 2003
por: Durieu-Thiry, E, et al.
Publicado: (2004) -
The operator interface to the equipment of the CERN PS accelerators
por: Cupérus, J, et al.
Publicado: (1993)