Cargando…
Operational experience with crab cavities at KEKB
KEKB was in operation from December 1988 to June 2010. The crab cavities were installed at KEKB in February 2007 and worked very stably until the end of KEKB operation. Operational experience of the crab cavities with beams is described.
Autor principal: | Funakoshi, Y. |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2014-004.27 http://cds.cern.ch/record/1955812 |
Ejemplares similares
-
Beam-loading issues and requirements for the KEKB crab RF system
por: Akai, K, et al.
Publicado: (1996) -
HOM absorbers of superconducting cavities for KEKB
por: Tajima, T, et al.
Publicado: (1996) -
KEKB and SuperKEKB
por: Koiso, H, et al.
Publicado: (2004) -
Beam test of a superconducting damped cavity for KEKB
por: Furuya, T, et al.
Publicado: (1998) -
Commissioning of the KEKB linac
por: Ogawa, Y, et al.
Publicado: (1998)