Cargando…
CERN Vacuum-System Activities during the Long Shutdown 1: The LHC’s Injector Chain
During the long shutdown 1 (LS1), several maintenance, consolidation and upgrade activities have been carried out in LHC’s injector chain. Each machine has specific vacuum requirements and different history, which determine the present status of the vacuum components, their maintenance and consolida...
Autores principales: | Ferreira, J A, Chiggiato, P |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1967023 |
Ejemplares similares
-
CERN Vacuum-System Activities during the Long Shutdown 1: The LHC Beam Vacuum
por: Baglin, V, et al.
Publicado: (2014) -
Work for the LHC’s first long shutdown
Publicado: (2013) -
LS1 “First Long Shutdown of LHC and its Injector Chains”
por: Foraz, K, et al.
Publicado: (2014) -
LS1 “First Long Shutdown of LHC and its Injector Chains”
por: Foraz, K, et al.
Publicado: (2014) -
Consolidations on the Vacuum Controls of the CERN Accelerators, During the First Long Shutdown of the LHC
por: Gomes, Paulo, et al.
Publicado: (2015)