Cargando…
LHC Experimental Beam Pipe Upgrade during LS1
The LHC experimental beam pipes are being improved during the ongoing Long Shutdown 1 (LS1). Several vacuum chambers have been tested and validated before their installation inside the detectors. The validation tests include: leak tightness, ultimate vacuum pressure, material outgassing rate, and re...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1968545 |
_version_ | 1780944648464760832 |
---|---|
author | Lanza, G Bregliozzi, G Baglin, V Chiggiato, P |
author_facet | Lanza, G Bregliozzi, G Baglin, V Chiggiato, P |
author_sort | Lanza, G |
collection | CERN |
description | The LHC experimental beam pipes are being improved during the ongoing Long Shutdown 1 (LS1). Several vacuum chambers have been tested and validated before their installation inside the detectors. The validation tests include: leak tightness, ultimate vacuum pressure, material outgassing rate, and residual gas composition. NEG coatings are assessed by sticking probability measurement with the help of Monte Carlo simulations. In this paper the motivation for the beam pipe upgrade, the validation tests of the components and the results are presented and discussed. |
id | cern-1968545 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2014 |
record_format | invenio |
spelling | cern-19685452022-08-17T13:28:04Zhttp://cds.cern.ch/record/1968545engLanza, GBregliozzi, GBaglin, VChiggiato, PLHC Experimental Beam Pipe Upgrade during LS1Accelerators and Storage RingsThe LHC experimental beam pipes are being improved during the ongoing Long Shutdown 1 (LS1). Several vacuum chambers have been tested and validated before their installation inside the detectors. The validation tests include: leak tightness, ultimate vacuum pressure, material outgassing rate, and residual gas composition. NEG coatings are assessed by sticking probability measurement with the help of Monte Carlo simulations. In this paper the motivation for the beam pipe upgrade, the validation tests of the components and the results are presented and discussed.CERN-ACC-2014-0271oai:cds.cern.ch:19685452014-11-11 |
spellingShingle | Accelerators and Storage Rings Lanza, G Bregliozzi, G Baglin, V Chiggiato, P LHC Experimental Beam Pipe Upgrade during LS1 |
title | LHC Experimental Beam Pipe Upgrade during LS1 |
title_full | LHC Experimental Beam Pipe Upgrade during LS1 |
title_fullStr | LHC Experimental Beam Pipe Upgrade during LS1 |
title_full_unstemmed | LHC Experimental Beam Pipe Upgrade during LS1 |
title_short | LHC Experimental Beam Pipe Upgrade during LS1 |
title_sort | lhc experimental beam pipe upgrade during ls1 |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1968545 |
work_keys_str_mv | AT lanzag lhcexperimentalbeampipeupgradeduringls1 AT bregliozzig lhcexperimentalbeampipeupgradeduringls1 AT baglinv lhcexperimentalbeampipeupgradeduringls1 AT chiggiatop lhcexperimentalbeampipeupgradeduringls1 |