Assessment of New Components to be integrated in the LHC Room Temperature Vacuum System

Integration of new equipment in the long straight sections (LSS) of the LHC must be compatible with the TiZrV non-evaporable getter thin film that coats most of the 6-km-long room-temperature beam pipes. This paper focus on two innovative accelerator devices to be installed in the LSS during the lon...

Descripción completa

Detalles Bibliográficos
Autores principales: Bregliozzi, G, Baglin, V, Chiggiato, P
Lenguaje:eng
Publicado: 2014
Materias:
Acceso en línea:http://cds.cern.ch/record/1968548
Descripción
Sumario:Integration of new equipment in the long straight sections (LSS) of the LHC must be compatible with the TiZrV non-evaporable getter thin film that coats most of the 6-km-long room-temperature beam pipes. This paper focus on two innovative accelerator devices to be installed in the LSS during the long shutdown 1 (LS1): the beam gas vertex (BGV) and a beam bending experiment using a crystal collimator (LUA9). The BGV necessitates a dedicated pressure bump, generated by local gas injection, in order to create the required rate of inelastic beam-gas interactions. The LAU9 experiments aims at improving beam cleaning efficiency with the use of a crystal collimator. New materials like fibre optics, piezoelectric components, and glues are proposed in the original design of the two devices. The integration feasibility of these set-ups in the LSS is presented. In particular outgassing tests of special components, X-rays photoelectron spectroscopy analysis of NEG coating behaviour in presence of glues during bake-out, and pressure profile simulations will be presented.