Cargando…
Assessment of New Components to be integrated in the LHC Room Temperature Vacuum System
Integration of new equipment in the long straight sections (LSS) of the LHC must be compatible with the TiZrV non-evaporable getter thin film that coats most of the 6-km-long room-temperature beam pipes. This paper focus on two innovative accelerator devices to be installed in the LSS during the lon...
Autores principales: | Bregliozzi, G, Baglin, V, Chiggiato, P |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1968548 |
Ejemplares similares
-
Vacuum Acceptance Tests for the UHV Room Temperature Vacuum System of the LHC during LS1
por: Cattenoz, G, et al.
Publicado: (2014) -
CERN Vacuum-System Activities during the Long Shutdown 1: The LHC Beam Vacuum
por: Baglin, V, et al.
Publicado: (2014) -
The LHC Vacuum Pilot Sectors Project
por: Henrist, B, et al.
Publicado: (2014) -
Present Quality Assurance for the LHC Beam Vacuum System and its Future Improvement
por: Sestak, Josef, et al.
Publicado: (2015) -
Vacuum Performance of Amorphous Carbon Coating at Cryogenic Temperature with Presence of Proton Beams
por: Salemme, Roberto, et al.
Publicado: (2016)