Testing Quality and Metrics for the LHC Magnet Powering System throughout Past and Future Commissioning
The LHC magnet powering system is composed of thousands of individual components to assure a safe operation when operating with stored energies as high as 10GJ in the superconducting LHC magnets. Each of these components has to be thoroughly commissioned following interventions and machine shutdown...
Autores principales: | , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1968620 |
_version_ | 1780944655064498176 |
---|---|
author | Anderson, D Audrain, M Charifoulline, Z Dragu, M Fuchsberger, K Garnier, JC Gorzawski, AA Koza, M Krol, K Rowan, S Stamos, K Zerlauth, M |
author_facet | Anderson, D Audrain, M Charifoulline, Z Dragu, M Fuchsberger, K Garnier, JC Gorzawski, AA Koza, M Krol, K Rowan, S Stamos, K Zerlauth, M |
author_sort | Anderson, D |
collection | CERN |
description | The LHC magnet powering system is composed of thousands of individual components to assure a safe operation when operating with stored energies as high as 10GJ in the superconducting LHC magnets. Each of these components has to be thoroughly commissioned following interventions and machine shutdown periods to assure their protection function in case of powering failures. As well as having dependable tracking of test executions it is vital that the executed commissioning steps and applied analysis criteria adequately represent the operational state of each component. The Accelerator Testing (AccTesting) framework in combination with a domain specific analysis language provides the means to quantify and improve the quality of analysis for future campaigns. Dedicated tools were developed to analyse in detail the reasons for failures and success of commissioning steps in past campaigns and to compare the results with newly developed quality metrics. Observed shortcomings and discrepancies are used to propose additional verification and mitigation for future campaigns in an effort to improve the testing quality and hence assure the overall dependability of subsequent operational periods. |
id | cern-1968620 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2014 |
record_format | invenio |
spelling | cern-19686202022-08-17T13:28:21Zhttp://cds.cern.ch/record/1968620engAnderson, DAudrain, MCharifoulline, ZDragu, MFuchsberger, KGarnier, JCGorzawski, AAKoza, MKrol, KRowan, SStamos, KZerlauth, MTesting Quality and Metrics for the LHC Magnet Powering System throughout Past and Future CommissioningAccelerators and Storage RingsThe LHC magnet powering system is composed of thousands of individual components to assure a safe operation when operating with stored energies as high as 10GJ in the superconducting LHC magnets. Each of these components has to be thoroughly commissioned following interventions and machine shutdown periods to assure their protection function in case of powering failures. As well as having dependable tracking of test executions it is vital that the executed commissioning steps and applied analysis criteria adequately represent the operational state of each component. The Accelerator Testing (AccTesting) framework in combination with a domain specific analysis language provides the means to quantify and improve the quality of analysis for future campaigns. Dedicated tools were developed to analyse in detail the reasons for failures and success of commissioning steps in past campaigns and to compare the results with newly developed quality metrics. Observed shortcomings and discrepancies are used to propose additional verification and mitigation for future campaigns in an effort to improve the testing quality and hence assure the overall dependability of subsequent operational periods.CERN-ACC-2014-0277oai:cds.cern.ch:19686202014-11-12 |
spellingShingle | Accelerators and Storage Rings Anderson, D Audrain, M Charifoulline, Z Dragu, M Fuchsberger, K Garnier, JC Gorzawski, AA Koza, M Krol, K Rowan, S Stamos, K Zerlauth, M Testing Quality and Metrics for the LHC Magnet Powering System throughout Past and Future Commissioning |
title | Testing Quality and Metrics for the LHC Magnet Powering System throughout Past and Future Commissioning |
title_full | Testing Quality and Metrics for the LHC Magnet Powering System throughout Past and Future Commissioning |
title_fullStr | Testing Quality and Metrics for the LHC Magnet Powering System throughout Past and Future Commissioning |
title_full_unstemmed | Testing Quality and Metrics for the LHC Magnet Powering System throughout Past and Future Commissioning |
title_short | Testing Quality and Metrics for the LHC Magnet Powering System throughout Past and Future Commissioning |
title_sort | testing quality and metrics for the lhc magnet powering system throughout past and future commissioning |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1968620 |
work_keys_str_mv | AT andersond testingqualityandmetricsforthelhcmagnetpoweringsystemthroughoutpastandfuturecommissioning AT audrainm testingqualityandmetricsforthelhcmagnetpoweringsystemthroughoutpastandfuturecommissioning AT charifoullinez testingqualityandmetricsforthelhcmagnetpoweringsystemthroughoutpastandfuturecommissioning AT dragum testingqualityandmetricsforthelhcmagnetpoweringsystemthroughoutpastandfuturecommissioning AT fuchsbergerk testingqualityandmetricsforthelhcmagnetpoweringsystemthroughoutpastandfuturecommissioning AT garnierjc testingqualityandmetricsforthelhcmagnetpoweringsystemthroughoutpastandfuturecommissioning AT gorzawskiaa testingqualityandmetricsforthelhcmagnetpoweringsystemthroughoutpastandfuturecommissioning AT kozam testingqualityandmetricsforthelhcmagnetpoweringsystemthroughoutpastandfuturecommissioning AT krolk testingqualityandmetricsforthelhcmagnetpoweringsystemthroughoutpastandfuturecommissioning AT rowans testingqualityandmetricsforthelhcmagnetpoweringsystemthroughoutpastandfuturecommissioning AT stamosk testingqualityandmetricsforthelhcmagnetpoweringsystemthroughoutpastandfuturecommissioning AT zerlauthm testingqualityandmetricsforthelhcmagnetpoweringsystemthroughoutpastandfuturecommissioning |