R2E–experience and outlook for 2012
2011 very successful LHC operation has provided valuable input for the detailed analysis of radiation levels and radiation induced equipment failures. Radiation levels around LHC critical areas and the LHC tunnel were studied in detail and compared to available simulation results, as well as put in...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1975479 |
_version_ | 1780945084798205952 |
---|---|
author | Brugger, M Calviani, M Mekki, J Spiezia, G |
author_facet | Brugger, M Calviani, M Mekki, J Spiezia, G |
author_sort | Brugger, M |
collection | CERN |
description | 2011 very successful LHC operation has provided valuable input for the detailed analysis of radiation levels and radiation induced equipment failures. Radiation levels around LHC critical areas and the LHC tunnel were studied in detail and compared to available simulation results, as well as put in perspective to LHC operation parameters. Observed radiation induced failures were not only analysed in detail, but already addressed through early relocation measures an d patch-solutions on the equipment level. Both improvements will continue during this winter shutdown together with the installation of heavy shielding around the RBs and UJs in Point-1. Based on measured radiation levels, calculations for the shielding improvements and expected operational parameters, this paper provides an update on the expected radiation levels around LHC critical areas. It briefly summarizes the already perfo rmed mitigation measures and equipment patches and provides an estimate on expected equipment failure rates during 2012 operation. Required beam and measurement studies are highlighted in order to further improve the predictions of both radiation levels and expected equipment failures, the latter driving the chosen mitigation actions for LS1. |
id | cern-1975479 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2012 |
record_format | invenio |
spelling | cern-19754792022-08-10T20:23:23Zhttp://cds.cern.ch/record/1975479engBrugger, MCalviani, MMekki, JSpiezia, GR2E–experience and outlook for 2012Accelerators and Storage Rings2011 very successful LHC operation has provided valuable input for the detailed analysis of radiation levels and radiation induced equipment failures. Radiation levels around LHC critical areas and the LHC tunnel were studied in detail and compared to available simulation results, as well as put in perspective to LHC operation parameters. Observed radiation induced failures were not only analysed in detail, but already addressed through early relocation measures an d patch-solutions on the equipment level. Both improvements will continue during this winter shutdown together with the installation of heavy shielding around the RBs and UJs in Point-1. Based on measured radiation levels, calculations for the shielding improvements and expected operational parameters, this paper provides an update on the expected radiation levels around LHC critical areas. It briefly summarizes the already perfo rmed mitigation measures and equipment patches and provides an estimate on expected equipment failure rates during 2012 operation. Required beam and measurement studies are highlighted in order to further improve the predictions of both radiation levels and expected equipment failures, the latter driving the chosen mitigation actions for LS1.oai:cds.cern.ch:19754792012 |
spellingShingle | Accelerators and Storage Rings Brugger, M Calviani, M Mekki, J Spiezia, G R2E–experience and outlook for 2012 |
title | R2E–experience and outlook for 2012 |
title_full | R2E–experience and outlook for 2012 |
title_fullStr | R2E–experience and outlook for 2012 |
title_full_unstemmed | R2E–experience and outlook for 2012 |
title_short | R2E–experience and outlook for 2012 |
title_sort | r2e–experience and outlook for 2012 |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1975479 |
work_keys_str_mv | AT bruggerm r2eexperienceandoutlookfor2012 AT calvianim r2eexperienceandoutlookfor2012 AT mekkij r2eexperienceandoutlookfor2012 AT spieziag r2eexperienceandoutlookfor2012 |