Cargando…
Multi-turn losses and cleaning in 2011 and 2012
LHC beam collimation is based on a hierarchical multistage cleaning system. Maintaining the correct hierarchy ensures maximal cleaning efficiency and machine protection. The operational collimator positions are established from the beam centres and sizes at each collimator measured in beam-based ali...
Autores principales: | , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1975493 |
_version_ | 1780945087167987712 |
---|---|
author | Valentino, G Assmann, R W Bellodi, G Bruce, R Burkart, F Cauchi, M Deboy, D Jowett, J M Lari, L Redaelli, S Rossi, A Salvachua Ferrando, B Wollmann, D |
author_facet | Valentino, G Assmann, R W Bellodi, G Bruce, R Burkart, F Cauchi, M Deboy, D Jowett, J M Lari, L Redaelli, S Rossi, A Salvachua Ferrando, B Wollmann, D |
author_sort | Valentino, G |
collection | CERN |
description | LHC beam collimation is based on a hierarchical multistage cleaning system. Maintaining the correct hierarchy ensures maximal cleaning efficiency and machine protection. The operational collimator positions are established from the beam centres and sizes at each collimator measured in beam-based alignments. These are verified periodically during the year. The improvements made to the collimator alignment algorithm in 2011 are described. The time spent on setup and qualification by loss maps is summarized in detail. The stability of the collimator setup and cleaning efficiency is presented. An outlook to 2012 is given, including detailed considerations on improved setup speed, required frequency of setup and qualification and other possible improvements overall reducing beam time consumption for collimation. |
id | cern-1975493 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2012 |
record_format | invenio |
spelling | cern-19754932022-08-10T20:23:24Zhttp://cds.cern.ch/record/1975493engValentino, GAssmann, R WBellodi, GBruce, RBurkart, FCauchi, MDeboy, DJowett, J MLari, LRedaelli, SRossi, ASalvachua Ferrando, BWollmann, DMulti-turn losses and cleaning in 2011 and 2012Accelerators and Storage RingsLHC beam collimation is based on a hierarchical multistage cleaning system. Maintaining the correct hierarchy ensures maximal cleaning efficiency and machine protection. The operational collimator positions are established from the beam centres and sizes at each collimator measured in beam-based alignments. These are verified periodically during the year. The improvements made to the collimator alignment algorithm in 2011 are described. The time spent on setup and qualification by loss maps is summarized in detail. The stability of the collimator setup and cleaning efficiency is presented. An outlook to 2012 is given, including detailed considerations on improved setup speed, required frequency of setup and qualification and other possible improvements overall reducing beam time consumption for collimation.oai:cds.cern.ch:19754932012 |
spellingShingle | Accelerators and Storage Rings Valentino, G Assmann, R W Bellodi, G Bruce, R Burkart, F Cauchi, M Deboy, D Jowett, J M Lari, L Redaelli, S Rossi, A Salvachua Ferrando, B Wollmann, D Multi-turn losses and cleaning in 2011 and 2012 |
title | Multi-turn losses and cleaning in 2011 and 2012 |
title_full | Multi-turn losses and cleaning in 2011 and 2012 |
title_fullStr | Multi-turn losses and cleaning in 2011 and 2012 |
title_full_unstemmed | Multi-turn losses and cleaning in 2011 and 2012 |
title_short | Multi-turn losses and cleaning in 2011 and 2012 |
title_sort | multi-turn losses and cleaning in 2011 and 2012 |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1975493 |
work_keys_str_mv | AT valentinog multiturnlossesandcleaningin2011and2012 AT assmannrw multiturnlossesandcleaningin2011and2012 AT bellodig multiturnlossesandcleaningin2011and2012 AT brucer multiturnlossesandcleaningin2011and2012 AT burkartf multiturnlossesandcleaningin2011and2012 AT cauchim multiturnlossesandcleaningin2011and2012 AT deboyd multiturnlossesandcleaningin2011and2012 AT jowettjm multiturnlossesandcleaningin2011and2012 AT laril multiturnlossesandcleaningin2011and2012 AT redaellis multiturnlossesandcleaningin2011and2012 AT rossia multiturnlossesandcleaningin2011and2012 AT salvachuaferrandob multiturnlossesandcleaningin2011and2012 AT wollmannd multiturnlossesandcleaningin2011and2012 |